DIY Home Improvement, Remodeling & Repair Forum > DIY Home Improvement > Walls and Ceilings > Removing a support header




Reply
 
LinkBack Thread Tools Search this Thread Display Modes
Old 06-24-2011, 05:57 PM  
nealtw
Contractor
 
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 9,681
Liked 787 Times on 702 Posts
Likes Given: 1349

Default

I hope you mean that the steal beam is under this wall or very close to it. Now I know the ceiling was held up with what was there but while you have the whole wall open, I would bring it up to todays standards. A simple header is two 2x10s nailed together three 3" nails every 12 inches. For a rough opening 36" wide you need a 39" header with a criple under each end and a stud on each end to hold it together. For headers 5 ft and longer add 3" and put 2 criples under each end.
When we have 2 or more openings like you do, we use one long header to cover all the openings.
In order to do this you would build your header and set in front of the wall on the floor and build a temp wall on each side to hold up the ceiling and re and re the wall.
If the beam down stairs is not directly below the wall I would extend the header as long as possible, full length would be best.
In the basement you want solid blocking between the beam and your floor sheeting when your cripples don,t land over a joist.
If the beam isn't right there, I would put solid blocking between the floor joists as in 2x10 pieces 14.5 inches long directly under your wall.
What were after is non squeeky floors and drywall that dosn't crack.



__________________
nealtw is offline  
 
Reply With Quote Quick reply to this message
Old 06-26-2011, 11:33 AM  
zinger77
Junior Member
 
Join Date: Jun 2011
Location: wauwatosa, WI
Posts: 12
Default

thank you everyone. we are moving ahead with moving the left studs over. A local carpenter is going to do the work to move it and reinforce it in the basement. Thanks

__________________
zinger77 is offline  
 
Reply With Quote Quick reply to this message
Old 06-26-2011, 05:15 PM  
inspectorD
Housebroken
HRT_MODERATOR.png
 
inspectorD's Avatar
 
Join Date: Dec 2005
Location: Litchfield, CT
Posts: 4,024
Liked 119 Times on 99 Posts
Likes Given: 254

Default Great

Good for you,
Now don't forget to show the after pictures.

__________________

Just My
Made in the

inspectorD is offline  
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Rotten header joist STLC1215 Introductions 2 11-08-2010 10:49 PM
Cracks in header harsuwind Framing and Foundation 4 11-08-2010 10:41 PM
garage door header butcher757 Framing and Foundation 6 09-10-2008 08:50 AM
Header problems electech46 Framing and Foundation 4 04-30-2008 09:01 AM
Header for new patio door maritadavis Windows and Doors 3 05-15-2007 08:22 AM