Default CBU under tub or after tub installation?

This may be a very basic question, but I've never done a complete tear out of a bathroom, and it has me thinking. Right now, I'm down to the studs and plywood subfloor. The plumbing is done aside from the tub drain and valve installation. The plumber is waiting for me to get the tub in. After I drywall, I plan to put down 1/4" CBU and tile. It seems to me that the tub should be installed after the CBU so that the floor isn't built up too high, but that would mean the proper order is: drywall - CBU on floor - tub - CBU on walls. Is this correct? If not, what is the proper order?



__________________
swindmill is offline  
 
Reply With Quote Quick reply to this message
Old 01-07-2014, 04:25 PM  
nealtw
Senior Member
 
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 9,006
Liked 690 Times on 617 Posts
Likes Given: 1212

Default

No the tub goes in first and the wall sheeting come down to just above the lip of the tub. If for what ever reason the floor need to be changed you want have to remove the tub.



__________________
nealtw is offline  
 
Reply With Quote Quick reply to this message
Old 01-07-2014, 04:36 PM  
swindmill
Senior Member
 
Join Date: Jan 2010
Posts: 167
Liked 12 Times on 11 Posts
Likes Given: 1

Default

Makes sense. So, the CBU on the floor butts up against the tub? After tile, that will leave about 1/2" of flooring built up next to the tub. That's the factor that had me questioning the order of things, but I suppose all remodels that keep existing tubs have quite a bit of flooring built up around the tub.

__________________
swindmill is offline  
nealtw Likes This 
Reply With Quote Quick reply to this message
Old 01-07-2014, 07:01 PM  
samfloor
Carpet Installer
 
samfloor's Avatar
 
Join Date: May 2010
Location: Buckner, Missouri
Posts: 190
Liked 12 Times on 10 Posts
Likes Given: 4

Default

Jus be sure that you put thinset under the cbu, too.

__________________

[url]http://www.flooringforum.com/forum/[/url]


(AKA Floorist, Rusty Baker)

samfloor is offline  
 
Reply With Quote Quick reply to this message
Old 02-26-2014, 06:05 AM  
BerthaSoy
Junior Member
 
Join Date: Feb 2014
Posts: 1
Default

A thinset is definitely a nice suggestion. I have used it in my bathroom and the tiles are attached wonderfully in the bathroom. http://www.truelocal.com.au/business/chemdry-city-and-metro/sydney

__________________

Last edited by BerthaSoy; 02-27-2014 at 10:24 PM.
BerthaSoy is offline  
 
Reply With Quote Quick reply to this message
Old 02-26-2014, 10:23 AM  
samfloor
Carpet Installer
 
samfloor's Avatar
 
Join Date: May 2010
Location: Buckner, Missouri
Posts: 190
Liked 12 Times on 10 Posts
Likes Given: 4

Default

Quote:
Originally Posted by BerthaSoy View Post
A thinset is definitely a nice suggestion. I have used it in my bathroom and the tiles are attached wonderfully in the bathroom.
Thinset under the CBU is a must.
__________________

[url]http://www.flooringforum.com/forum/[/url]


(AKA Floorist, Rusty Baker)

samfloor is offline  
 
Reply With Quote Quick reply to this message
Old 02-26-2014, 01:03 PM  
Jaz
Ceramic Tile Pro
 
Jaz's Avatar
 
Join Date: Mar 2006
Location: Troy, Michigan
Posts: 75
Liked 13 Times on 10 Posts

Default

Quote:
Originally Posted by BerthaSoy
A thinset is definitely a nice suggestion.
As Sam said, it's not a suggestion, it's a requirement.

You mentioned wallboard around the tub. What's the finish covering going on these walls?

Jaz
__________________

Tile 4 You LLC
Troy, Michigan
www.tile4you.com

I've NEVER made a mistake....I thought I did once....but I was WRONG!

Jaz is offline  
 
Reply With Quote Quick reply to this message
Old 02-26-2014, 07:31 PM  
swindmill
Senior Member
 
Join Date: Jan 2010
Posts: 167
Liked 12 Times on 11 Posts
Likes Given: 1

Default CBU under tub or after tub installation?

This wasn't my first time putting CBU on a floor, or tiling a floor; I always use thinset. This was the first time I've completely gutted a bathroom and replaced the tub, hence the original question.

12 1/2" porcelain tiles were used for everything.

imageuploadedbyhome-repair1393468287.398100.jpg


Sent from my iPhone using Home Repair

__________________
swindmill is offline  
nealtw Likes This 
Reply With Quote Quick reply to this message
Old 02-26-2014, 08:53 PM  
Jaz
Ceramic Tile Pro
 
Jaz's Avatar
 
Join Date: Mar 2006
Location: Troy, Michigan
Posts: 75
Liked 13 Times on 10 Posts

Default

I was just wondering what type of CBU you used on the walls above the tub. Were you able to waterproof the walls, especially the window?

Jaz

__________________

Tile 4 You LLC
Troy, Michigan
www.tile4you.com

I've NEVER made a mistake....I thought I did once....but I was WRONG!

Jaz is offline  
 
Reply With Quote Quick reply to this message
Old 02-28-2014, 04:40 PM  
swindmill
Senior Member
 
Join Date: Jan 2010
Posts: 167
Liked 12 Times on 11 Posts
Likes Given: 1

Default

I used 1/2" Hardie. Put plastic on the studs and wrapped on the window with silicone where needed. Also put a reasonable slope on the sill when I tiled. The window shouldn't see much more than a little bit of water that might splash up there.


Sent from my iPhone using Home Repair



__________________
swindmill is offline  
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Gas fireplace installation Fabulous Mr. Fixit Plumbing Forum 3 12-18-2008 08:14 PM
AC installation/help/replacement alfalfmarkie HVAC 1 07-17-2008 11:51 AM
sheetrock installation hrpfwass Flooring 5 04-11-2008 07:35 PM
fireplace installation newhome4me Flooring 4 01-21-2006 10:25 AM