02-19-2013, 10:41 AM
|
|
|
Senior Member
Join Date: Jan 2010
Posts: 126
Liked 3 Times on 2 Posts
|
Cutting/installing glue down cork
|
|
|
02-19-2013, 11:14 AM
|
|
|
Junior Member
Join Date: Dec 2012
Location: Jacksonville, Illinois
Posts: 140
Liked 21 Times on 19 Posts Likes Given: 13
|
Nice job so far. I would go the route you suggested. Cut and dry fit everything you can before rolling on adhesive. Maybe do the area against the tub and out to the corner as a first stage, then proceed from there.
|
|
|
02-19-2013, 12:39 PM
|
|
|
Senior Member
Join Date: Jan 2010
Posts: 126
Liked 3 Times on 2 Posts
|
Since posting this, I've realized that the wall to the right when looking in from the door is not even close to square. That's an exterior wall on a 110 year old house, so that's no surprise. Anyways, I was thinking that I could square off of the right side of the cellar door, which would save me from having to cut around that side of the door, as I can just butt the tiles up against that side. The only issue is that the small space left between that column of tiles and the right side wall will create a decent amount of wasted flooring. I think I have enough to waste some, so that's not a huge deal. That would leave only the left side of the door that I would have to cut tiles to fit around.
You suggested starting at the tub; I suppose it's recommended to start with full tiles at the tub rather than the door? I'll be using a brick pattern, but you know what I mean by "full tile".
|
|
|
02-19-2013, 01:04 PM
|
|
|
Junior Member
Join Date: Dec 2012
Location: Jacksonville, Illinois
Posts: 140
Liked 21 Times on 19 Posts Likes Given: 13
|
I have never worked with the exact flooring you are using. I am assuming that your joints will almost be hidden. Not obvious anyway. I would use the end of your door opening and fit back toward the tub. It looks like you could stand in the opening and reach back to the tub. Before deciding where to put your seams try to balance the floor area where you will not have a narrow strip at either wall or the tub. Sometimes it works out well and other times not so well. If you can get it to work use your drops from the right side finish out the left side. And sometimes you just have more waste than you want.
|
|
|
02-19-2013, 04:33 PM
|
|
|
Senior Member
Join Date: Jan 2010
Posts: 126
Liked 3 Times on 2 Posts
|
I'm off to a decent start, and so far I haven't wasted a tile with a bad cut. I'm now stuck trying to decide how to do the cellar door. I'll either have a small strip down the middle, like this:
Or, I could turn the tiles sideways, and cut them into whatever design I want.
I don't like the change up in patterns when turned sideways, so I'm leaning towards the strip down the middle. The only other option I have is to cut six tiles to identical widths and lay them vertically, but that would require more tile, and some very precise cutting.
I bring this up here, because I assume flooring guys must run into this type of thing somewhat often (not a cellar door, necessarily).
|
|
|
02-19-2013, 05:14 PM
|
|
|
Senior Member
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 4,752
Liked 211 Times on 197 Posts Likes Given: 326
|
I'm late to the party, but that's never stoped me before.
I would draw center lines on the door both ways and extend the lines out to the edges of the floor. You can either start with a full tile on each side of the line or center a tile over the line, which ever works out without giving you slivers to work with. Generally you want just less than half a tile on each side but in this case I think it should work with the door first and the vanity will hide most the far side anyway. Making it look like you cut the tile to allow for the frame is what I think will look best.
|
|
|
02-19-2013, 06:27 PM
|
|
|
Senior Member
Join Date: Jan 2010
Posts: 126
Liked 3 Times on 2 Posts
|
I like that advice, but I've cut too many tiles to start that way now. It actually came pretty close to turning out as if I did that way, if I'm reading your suggestion correctly. My only remaining problem (aside from cutting around the closet and washer/dryer alcove) is finding a way to fit tiles on the cellar door, as I posted above. The seams are not very noticeable, so I suppose it's not a huge deal. When the tiles are glued and rolled, the seams may be very difficult to see.
|
|
|
02-19-2013, 07:17 PM
|
|
|
Senior Member
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 4,752
Liked 211 Times on 197 Posts Likes Given: 326
|
If I go back more than a few years ago, we tiled with the old 9x9 lino tiles. To get the close fit to wall, you tiled up close with full tiles and the set another tile on top of the last one and then set a full tile up against the wall on top of that one and sribe a line with a knife at the back of that on the one under it. The peice sticking out will be the peice that fits the hole.
I'm sure that could have been said with less words, I hope it helps.
|
|
|
02-20-2013, 08:34 AM
|
|
|
Junior Member
Join Date: Dec 2012
Location: Jacksonville, Illinois
Posts: 140
Liked 21 Times on 19 Posts Likes Given: 13
|
I agree with you that the strip down the middle is not the most attractive. Can you center the two full tiles and split the center strip into two pieces, one for each side? Or can you line up the stripes in the tiles with the strips in the floor off the door and end up with a strip to one side? That way you can keep factory edges together in the middle and have your cut edges next to the door frame. I think that will show less when finished. Is that a little clearer than mud? Looking good so far.
|
|
|
02-20-2013, 05:00 PM
|
|
|
Senior Member
Join Date: Jan 2010
Posts: 126
Liked 3 Times on 2 Posts
|
I think I'll end up going with Fireguy's second suggestion: lining up the lines with the rest of the floor. I'll have to cut off a 1.5" strip from two full tiles to run down the right side and then I'll have a small strip on the left side, but it will match the lines running from the door to tub. All I have left to cut is the door tiles at this point, but my knees have given out on me tonight.
Any suggestions on how to pull this up in an orderly way so that I can roll the glue down and not forget what pieces go where? I'm thinking one pile for each column, but even that is going to get confusing. The glue sits for 30 minutes before putting down tile, and I'm assuming I can't walk on it, so I'll have to do three sections, one at a time (at least three). Also, I'm planning on glueing down the column that I used to square everything with first; that being the one along the left side of the door. That way the column to the right of that can be pressed against it, leaving any gaps against the wall.
|
|
|
| Thread Tools |
Search this Thread |
|
|
|