Sinking Slab
Hello,
I have a 470 sq.ft. slab of living room whee half of it has sunk and it was covered by concrete and carpet on top. I wanted to tile the room, the concrete was poured on viynl tile. I removed concrete and tile. The lowest point of that sinking floor is 5".
My question: Can I pour concrete on top of that sinking floor to make it level and put tile on it?
|
|
|
02-22-2011, 09:48 PM
|
|
|
Senior Member
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 5,046
Liked 237 Times on 220 Posts Likes Given: 394
|
One side is 5", how bad is the other side
|
|
|
02-23-2011, 05:59 AM
|
|
|
Junior Member
Join Date: Feb 2011
Location: Louisville, Kentucky
Posts: 3
|
The other side is about half inch then it increases as it goes to the wall where the 5" is (like a slop). I have a picture but I didn't know how to post it.
Thank you very much!
|
|
|
02-23-2011, 06:06 AM
|
|
|
Carpet Installer
Join Date: May 2010
Location: Buckner, Missouri
Posts: 145
Liked 5 Times on 3 Posts Likes Given: 2
|
There are companies that can force concrete under the slab and raise it back into place.
__________________
[url]http://www.flooringforum.com/forum/[/url]
|
|
|
02-23-2011, 06:09 AM
|
|
|
Moderator
Join Date: Jul 2009
Location: Nashville, TN
Posts: 2,560
Liked 123 Times on 105 Posts Likes Given: 22
|
Quote:
Originally Posted by abugabal
The other side is about half inch then it increases as it goes to the wall where the 5" is (like a slop). I have a picture but I didn't know how to post it.
Thank you very much!
|
If you have a picture saved on your computer you can attach it to a post on the reply screen, if you scroll down from where the text area is you will see a heading "attachments", its easy, just follow the directions on the following screens.
|
|
|
02-23-2011, 08:52 AM
|
|
|
Senior Member
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 5,046
Liked 237 Times on 220 Posts Likes Given: 394
|
I agree with Sam, I think mud jacking would be best. Remove and replace would be my second choice.
mud jacking is when they drill a hole in the slab and pump in concrete and releval the floor.
|
|
|
03-17-2011, 09:37 PM
|
|
|
Junior Member
Join Date: Feb 2011
Location: Louisville, Kentucky
Posts: 3
|
Thanks for your replies.
I took your advice and called a company to do the "mud-jacking." They drilled 3 wholes and started pumping and the slab rose 1" and almost 4" to go but their pumping machine broke. So they told me they have to reschedule. My question to you: The "stuff" they pumped, is it going to be a problem when they try to pump again? I mean, will it dry and prevent proper expansion of that "mud" or "cement"?
Thanks again.
|
|
|
03-17-2011, 10:28 PM
|
|
|
Senior Member
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 5,046
Liked 237 Times on 220 Posts Likes Given: 394
|
Good question, bad luck. I do think they will be able to drill thru there product and pump under that, but I guess you will find out.
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|
|