DIY Home Improvement, Remodeling & Repair Forum > DIY Home Improvement > Flooring > starting a basement project





Reply
 
LinkBack Thread Tools Search this Thread Display Modes
Old 06-18-2008, 03:39 PM  
sesame189
Junior Member
 
Join Date: Jun 2008
Posts: 4
Default starting a basement project

Okay wife wants too re do basement including ripping out carpet and old cedar tongue and grouve boards and replace it with sheet rock , for the floor we have enough laminate i got for free its 12 mil. but she wants tile in front of open bar as we want too eventually put a counter too make it look finish. Here is my question can i just lay the tile right too the concrete and just use a reducer from the laminate too the tile or is there a better way.



__________________
sesame189 is offline  
 
Reply With Quote Quick reply to this message
Old 06-18-2008, 05:27 PM  
PaulMin
Junior Member
 
Join Date: Jun 2008
Posts: 5
Default

That would be about the best way to lay the tile. Right on the slab. If you want to bring it up to the level of the Lam then add cement board accordingly. But if you don't mind the transition go right on top of the slab. 12 mil is pretty thick Lam. Make sure whatever bull nose you use to trim the lam has enough thickness or you may have to build it up a little.



__________________
PaulMin is offline  
 
Reply With Quote Quick reply to this message
Old 06-18-2008, 08:26 PM  
sesame189
Junior Member
 
Join Date: Jun 2008
Posts: 4
Default

thanxs paul

__________________
sesame189 is offline  
 
Reply With Quote Quick reply to this message
Old 06-18-2008, 09:52 PM  
ChrWright
Builder/Remodeler
 
ChrWright's Avatar
 
Join Date: Jan 2008
Location: Indianapolis, IN
Posts: 14
Send a message via Skype™ to ChrWright
Default

You must be careful when laying tile directly to concrete.

If there are any cracks or control joints in the area you are tiling, you'll need to use an isolation membrane--which prevents those cracks from transfering up into your tile over time. There are several types which usually don't add much to the overall thickness of the floor.

If you have laminate directly over the slab, you shouldn't have a transition issue with most floor tiles. The ready-made laminate "T" transitions should work fine.

__________________

Christopher Wright, CR - WrightWorks, LLC - Named to the 2010 REMODELING Big50
[URL="http://www.WrightWorks.net"]www.WrightWorks.net[/URL] [URL="http://wrightworks.net/Company-Info.htm"]Indianapolis Remodeling Contractor[/URL] [URL="http://www.facebook.com/WrightWorks"]Facebook[/URL] [URL="http://twitter.com/ChrWright"]Twitter[/URL] [URL="http://www.formspring.me/ChrWright"]Formspring.me[/URL]
[B]"When we build, let us think that we build forever."[/B] --John Ruskin

ChrWright is offline  
 
Reply With Quote Quick reply to this message
Old 06-26-2008, 12:35 AM  
sesame189
Junior Member
 
Join Date: Jun 2008
Posts: 4
Default re basement proj

Was wondering as well what mil of vapor barrier too lay down on the slab before i put foam down and do i bring the plastic a bit up the wall on studding or up too sill plate.

__________________
sesame189 is offline  
 
Reply With Quote Quick reply to this message
Old 06-27-2008, 07:17 AM  
CyFree
Member
 
Join Date: May 2008
Posts: 46
Default

Another problem with laying tiles directly into concrete:
moisture from the concrete seeps through the grouts and overtime, it might grow moldy.
Another concern: heating costs. Tiles will absorb the cold from the slab underneath and it takes a lot of heat to bring them to comfortable temperatures. I'd go for a flooring solution that is specifically made for basements.
- They are modular, so that you can take a piece out to fix a crack on the slab or replace a tile if it gets damaged just as you'd do with a tile carpet.
-They act as a vapor barrier so you do not need to install one underneath. And there are a number of studies about the energy savings they allow.
-They won't rot, grow mold, absorb moisture and, save an eventual tile replacement in heavy traffic areas, you will never have to rip it all out.
Unless you want to go for another overall look.
-They can be used (you can walk and place furniture on) immediately after installation.

__________________
CyFree is offline  
 
Reply With Quote Quick reply to this message
Old 06-27-2008, 09:50 AM  
sesame189
Junior Member
 
Join Date: Jun 2008
Posts: 4
Default thanxs for the response cyfree

The wife wants a small area done in front of the bar downstairs in tile , i am considering maybe putting concreate board down first in that area it would be like 3x8 section

__________________
sesame189 is offline  
 
Reply With Quote Quick reply to this message
Old 07-20-2008, 11:50 AM  
HomeAdditionPlus
HomeAdditionPlus
 
Join Date: Jul 2008
Posts: 6
Default

You can attach the tile directly to the concrete floor, however if there are cracks or it is unlevel, first apply a leveling agent.



__________________

[U]Mark[/U]
[URL="http://www.homeadditionplus.com"]HomeAdditionPlus.com[/URL]

HomeAdditionPlus is offline  
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Small(ish) basement project sigma General Home Improvement Discussion 5 11-29-2008 01:39 AM
Basement advice RyanBruner Flooring 9 09-19-2008 10:02 PM
Warm, smelly basement. DaveX General Home Improvement Discussion 3 08-20-2008 01:14 PM
Getting basement air into the return? Quattro HVAC 8 01-10-2008 07:51 AM
Old basement entry door found and leaks! wienerwater Framing and Foundation 1 09-07-2006 12:34 PM