Progress update
I used hardibacker with a layer of roof felt between the bricks and the hardibacker. Used construction glue to cement the roof felt to the brick.
The hardibacker was screwed into the mortar using concrete screws (2 1/2")
The new wall was created using 2 x 6 studs to be able to take the weight of a 50" LCD TV.
The mantle itself is LACK model floating shelving from IKEA. Cost me $20 for the long one and $12 for the shorter piece. Has a great mounting system. I put Dry wall on the shelving material, 1. to make it look thicker, and 2. to be able to match colors.
Waiting for the stone slab for the Hearth and trying to decide between regular paint vs Venetian.
I have uploaded a progress picture in my gallery for anyone interested.
__________________
Laks@California
|