Old 06-15-2012, 11:20 PM  
nickit
Junior Member
 
Join Date: Jun 2012
Posts: 3
Default Closing in a basement wall opening.

I need to close up a 24" width by 50 3/8 tall opening in a basement block wall. This opening leads to a old well pit under the outside steps. Old well is sealed. What do contractors do when the wall is the old size blocks ( 17.5 x 12 x 8) and new standard block are only 7 5/8 tall. 6 courses of 7 5/8 tall with 3/8" joints leaves a gap of 2 inches. How would they fill that gap? Slice a block down? Also, when adding vertical rebar and core filling, how do you do that on the top block? Because this opening in the wall is 4 sided, it is not open on the top. Once the block is in place, you can't get to the rebar to position it.



__________________
nickit is offline  
 
Reply With Quote Quick reply to this message
Old 06-20-2012, 05:48 PM  
BridgeMan
Senior Member
 
BridgeMan's Avatar
 
Join Date: Aug 2011
Location: Cottage Grove, Oregon
Posts: 738
Liked 75 Times on 67 Posts

Default

Most big box stores sell solid concrete stepping stones 2" thick, usually not too expensive--cut a few of them down to match the block dimensions you're using. If you really think you need rebar in the wall (to resist exactly what?), forget about block and just form and pour solid reinforced concrete. Use steel forms for the back face, as you won't be able to get to them for stripping, and if wood, could start to rot and stink after a few years.



__________________
BridgeMan is offline  
nealtw Likes This 
Reply With Quote Quick reply to this message
Old 06-20-2012, 11:25 PM  
CallMeVilla
Contractor
 
CallMeVilla's Avatar
 
Join Date: Feb 2010
Location: San Diego
Posts: 1,271
Liked 388 Times on 304 Posts
Likes Given: 161

Default

Yes, I have seen blocks cut down to size using a masonry blade and a dedicated saw. I would never use my worm drive Skillsaw which I use for wood. Rebar seems overkill. Just mortar and block should be sufficient.

Good luck!

__________________
CallMeVilla is offline  
 
Reply With Quote Quick reply to this message
Old 06-20-2012, 11:33 PM  
nickit
Junior Member
 
Join Date: Jun 2012
Posts: 3
Default

Thanks BridgeMan. Starting to think about just pouring it. At 12" thick, I'm looking at a just over 8 cubic feet which is something like 25 bags from the store. Probably too much for me to mix in the wheelbarrow. I can get readymix from the local rental place in a trailer. May just go that route. Also though about just pouring the first 2 inches of the opening to bring it up in height (and level the opening) and then use the block. Later this year the plan is to replace the steps and patio. Just as soon as this is somewhat cured. So I will be able to get to the outside form after the fact to remove it and will waterproof the outside wall. Rebar is required by the local inspector to provide support against the outside force of the fill I will add when the steps are replaced. Even though there is a foundation for the steps and I guess I could leave the pit empty, I plan to add holes to the well pit floor to ensure water does not pool in the pit and then fill it in.
Thanks again. Nice to get another opinion to make sure I am not way off track.

__________________
nickit is offline  
 
Reply With Quote Quick reply to this message
Old 06-21-2012, 02:01 AM  
nealtw
Contractor
 
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 10,230
Liked 841 Times on 751 Posts
Likes Given: 1456

Default

25 bags would not be to much to mix by hand but you would still have to finish with block at the top and building a form on the other side of this wall may be vary tricky.

__________________
nealtw is offline  
 
Reply With Quote Quick reply to this message
Old 06-21-2012, 08:08 AM  
JoeD
Contractor
 
Join Date: Mar 2006
Location: Welland, Ontario
Posts: 966
Liked 102 Times on 84 Posts
Likes Given: 4

Default

I would use what ever block is available and cut them to fit at the end. Fill the top gap with solid concrete bricks.
I might even consider just building stud wall and insulating and vapour barrier.

__________________
JoeD is offline  
 
Reply With Quote Quick reply to this message
Old 06-22-2012, 12:12 AM  
nickit
Junior Member
 
Join Date: Jun 2012
Posts: 3
Default

Thanks everyone for the responses. Still thinking about which way I will go and this thread has given me some interesting ideas.



__________________
nickit is offline  
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Basement Chimney Wall Opening tk3000 General Home Improvement Discussion 1 12-18-2010 05:47 AM
opening up a wall between 2 rooms actionjaxon Walls and Ceilings 1 01-12-2010 05:53 AM
Opening a wall 1989gta Framing and Foundation 14 01-31-2009 07:40 AM
opening a wall 1989gta Framing and Foundation 0 12-17-2008 09:24 PM
opening up a stairway in basement? triptakers General Home Improvement Discussion 13 07-06-2008 07:43 PM