Most shrinkage cracks occur in the first few months. A good control joinr (sawed or formed) should crack within a week or two. The amount of shrinkage depends on the amount of water used in the mix (more water, more shrinkage).
If your cracks following the sawed joint as planned?
The "horizontal" (lengthwise?) crack may have closed slightly if the driveway was warm and expanded.
Did you you wire reinforcement for crack control?
|