I am finishing up my rough-ins for the toilet and would like to confirm the final steps.

1) connecting a toilet-offset flange; do I caulk or glue?
2) same with the shower drain?
3) which concrete type should I use for the patch work and should I maintain the same concrete depth as the floor 4" or can I fill with stone and go to 2"?





__________________
micgall is offline  
 
Reply With Quote Quick reply to this message
Old 09-08-2008, 12:49 PM  
handyguys
Senior Member
 
handyguys's Avatar
 
Join Date: Feb 2008
Location: USA
Posts: 815
Liked 1 Times on 1 Posts

Send a message via Skype™ to handyguys
Default

I cant tell from your pictures for sure.

The offset flange - Should be connected with whatever is required for materials its made from. Assuming its PVC then you would use glue. There are no circumstances I can think of where caulk would be used.

Shower drain - No caulk or glue here. Your shower pan will have instructions for its particular drain connection. Get the pan before you go any further. Many pans will connect to the drain with a rubber gasket. The rough in plumbing location is critical. Dry fit everything before glueing if using PVC.

As for concrete - You can use sacrete concrete. The bagged stuff. Also sold as quickcrete. No need for 'high strength' or 'fast setting'. I would do it to the same 4". Make sure your pipes are supported by the gravel fill underneath.



__________________

The Handyguys Podcast [url]http://www.handyguyspodcast.com[/url]

handyguys is offline  
 
Reply With Quote Quick reply to this message
Old 09-08-2008, 09:07 PM  
micgall
Junior Member
 
Join Date: Sep 2008
Location: Windsor, Ontario
Posts: 10
Default

Thanks for the reply
PS ...
can I pour concrete on concrete to build my slope for my shower pan? for example from 1" to 1/2" toward the drain.

__________________
micgall is offline  
 
Reply With Quote Quick reply to this message
Old 09-09-2008, 07:22 PM  
glennjanie
Senior Member
 
Join Date: Mar 2006
Posts: 2,992
Liked 2 Times on 2 Posts

Send a message via AIM to glennjanie
Default

Hello Micgall:
I would cut out all of the shower area and put 4" of concrete back on the slope. You can build it up with rock. The minimum thickness of concrete, alone or on top of another pour, is 2".
Glenn

__________________
glennjanie is offline  
 
Reply With Quote Quick reply to this message
Old 09-10-2008, 10:36 AM  
micgall
Junior Member
 
Join Date: Sep 2008
Location: Windsor, Ontario
Posts: 10
Default

Glennjanie,
That is smart idea (cut out the entire shower base to gravel); I would never have considered that. Although you are trippling my work.

What would be the possible consequences of going this way...
placing a bond break (felt-paper) at the floor slab, then building up a more shallow slope with thin set or concrete (minimum thickness of 1/2")... This will help me to better understand best pratices.

__________________
micgall is offline  
 
Reply With Quote Quick reply to this message
Old 09-10-2008, 10:55 AM  
handyguys
Senior Member
 
handyguys's Avatar
 
Join Date: Feb 2008
Location: USA
Posts: 815
Liked 1 Times on 1 Posts

Send a message via Skype™ to handyguys
Default

When I responded I didn't realize you were not doing a pre-fabbed shower base. I would NOT recommend going down the path you are considering. Use a premade base.

You can get them in marble, solid surface, corian, PVC, acrylic and others. Trust me, it will make life a lot easier and will be less prone to leaks.

__________________

The Handyguys Podcast [url]http://www.handyguyspodcast.com[/url]

handyguys is offline  
 
Reply With Quote Quick reply to this message
Old 09-10-2008, 01:26 PM  
micgall
Junior Member
 
Join Date: Sep 2008
Location: Windsor, Ontario
Posts: 10
Default Even more thanks

You guys ARE good! I have decided then to go with the pre-fab. I will need only corrected a shortened drain but considering the work and potential problems I am avoiding... better bang for the buck. Thanks.

Since I have found this site, I will certianly follow your postings (and be wiser for it).

__________________
micgall is offline  
 
Reply With Quote Quick reply to this message
Old 09-10-2008, 01:39 PM  
handyguys
Senior Member
 
handyguys's Avatar
 
Join Date: Feb 2008
Location: USA
Posts: 815
Liked 1 Times on 1 Posts

Send a message via Skype™ to handyguys
Default

Lets see some before and after pictures!
[begin self promotion]
Have you checked out my podcast series on finishing a basement?
http://www.handyguyspodcast.com/tag/basement-finishing-series
Check it out
[end self promotion]



__________________

The Handyguys Podcast [url]http://www.handyguyspodcast.com[/url]

handyguys is offline  
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Smoothing a rough concrete finish? marin guy Bricks, Masonry and Concrete 2 09-22-2008 02:45 PM
Rough Pourch Finish mfank General Home Improvement Discussion 5 08-09-2008 10:10 PM
Wanting to Finish Basement. kotah General Home Improvement Discussion 7 08-04-2008 06:36 AM
Getting basement air into the return? Quattro HVAC 8 01-10-2008 07:51 AM
cheapest way to finish a basement cdcellular Flooring 4 05-14-2006 06:47 PM