Old 10-23-2011, 03:10 PM  
dw8
Junior Member
 
Join Date: Oct 2011
Location: Tucson, AZ
Posts: 26
Default Floor Joist Framing

I'm dealing with a small master bath off a bedroom. The floor joist in the bath are
as shown in the attached picture. Each floor joist is a 3(w)x9(h)x20(l) which rest on the main beam (dotted lines in picture). The left most beam 2(w) x 10(h) is attached to a block wall. The full round circle on the left between the two beams is the current toilet location (4 inch ABS soil pipe). The half circle is a 3 inch ABS shower drain where the original plumber notched the beam -- hence the half circle. Per picture, to accommodate the original toilet soil pipe, one beam was cut and blocked such that the two adjacent beams now bear the load (weight).

The desire is to redo the shower such that the shower is moved over the toilet area and the toilet is moved over the shower area. I believe I can find a shower pan where the hole in the pan will go between the beams.

My problem is the toilet, in that the soil pipe will be directly located on the notched beam, such that the notched beam will now need to be cut and blocked. This would then cause the floor joints to have two blocked beams next to each other. There is "no way" the original block floor joist can be replaced.

My concern is the beams being over loaded (to much weight). Any comments and solutions appreciated.

David



File Type: bmp MstrBath.bmp (174.0 KB, 445 views)
__________________

Last edited by dw8; 10-23-2011 at 03:39 PM.
dw8 is offline  
 
Reply With Quote Quick reply to this message
Old 10-23-2011, 03:48 PM  
nealtw
Senior Member
 
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 9,025
Liked 693 Times on 619 Posts
Likes Given: 1215

Default

I don't no what is called and can't find it on the net but the plumbers here often use a toilet flange that has a 45 degree angle and they only shave the top of the floor joist to get it work.



__________________
nealtw is offline  
 
Reply With Quote Quick reply to this message
Old 10-23-2011, 04:22 PM  
isola96
Senior Member
 
isola96's Avatar
 
Join Date: Oct 2011
Location: Lagrangeville, New York
Posts: 437
Liked 6 Times on 6 Posts

Default

Offset flange is what u need and posting a picture for better description would also help us.
Make shore your flange is sitting above your subfloor as well.

Sister in your joists were your tub is going and any were else you feel it to be safe for extra support.

__________________

Last edited by isola96; 10-23-2011 at 04:25 PM.
isola96 is offline  
 
Reply With Quote Quick reply to this message
Old 10-23-2011, 09:03 PM  
dw8
Junior Member
 
Join Date: Oct 2011
Location: Tucson, AZ
Posts: 26
Default

Thanks for input guys but an offset flange will Not work because of space requirements. Beam needs to be cut and blocked. The issue (question) is what impact will this have on the adjacent beams as you add additional weight -- floor, possible tile floor, possible tile or e.g. "corian" shower base

__________________
dw8 is offline  
 
Reply With Quote Quick reply to this message
Old 10-23-2011, 11:29 PM  
nealtw
Senior Member
 
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 9,025
Liked 693 Times on 619 Posts
Likes Given: 1215

Default

If your joists are 3x9, they are like double 2x10s, but 20 ft long is a little much and I don't have a good answer.

__________________
nealtw is offline  
 
Reply With Quote Quick reply to this message
Old 10-24-2011, 11:02 AM  
isola96
Senior Member
 
isola96's Avatar
 
Join Date: Oct 2011
Location: Lagrangeville, New York
Posts: 437
Liked 6 Times on 6 Posts

Default

Can you provide picture of the joists
This photo is similar to what you need to do for support?.....



image-757409657.png

__________________
isola96 is offline  
 
Reply With Quote Quick reply to this message
Old 10-24-2011, 08:06 PM  
dw8
Junior Member
 
Join Date: Oct 2011
Location: Tucson, AZ
Posts: 26
Default

isola96:

Thanks for the picture.

Found a hole in the plenum crawl area which will allow me to insert a beam from the outside
"close to" the same size as the current floor joints.

If that won't work, most likely I will have to create a new pier for the joist to rest on as I don't think two headers will be allowed side by side. My current thoughts are that I could "remove" the current toilet headers and put in a new joist. I could then header off the old notched joist so the toilet would fit there.

Going down and making an attempt to meet with our city engineer tomorrow to discuss the problem. Will post results meeting here, if any.

__________________
dw8 is offline  
 
Reply With Quote Quick reply to this message
Old 10-25-2011, 01:22 AM  
BridgeMan
Senior Member
 
BridgeMan's Avatar
 
Join Date: Aug 2011
Location: Cottage Grove, Oregon
Posts: 731
Liked 66 Times on 60 Posts

Default

Where I come from, it's called "creative framing to correct plumber's butcher job." I've done it on 3 homes that I can recall, maybe more. One was a brand new place, with a fresh occupancy permit. I think the inspector did a "drive-by" on that one (slowed to 20 mph while doing the plumbing rough-in inspection, from behind the wheel--tight schedule, you know).

__________________
BridgeMan is offline  
 
Reply With Quote Quick reply to this message
Old 10-25-2011, 03:05 PM  
dw8
Junior Member
 
Join Date: Oct 2011
Location: Tucson, AZ
Posts: 26
Default

Meet with city engineer. Had a program called StruCalc where he determined floor loads.
Based on joist indicated I was at 50% and could put in the headers side by side.
Since I found the wall opening where I can insert another joist, I think I'm going to put in the new header and then a (2 x 9) nominal trim joist -- a little smaller in size -- just to be on the safe side. Would prefer engineered joist, but doubt if I can get just "one". May even have trouble finding a "quality" trim joist of length I need.

__________________
dw8 is offline  
 
Reply With Quote Quick reply to this message
Old 10-25-2011, 05:51 PM  
nealtw
Senior Member
 
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 9,025
Liked 693 Times on 619 Posts
Likes Given: 1215

Default

Sounds great. Good luck with the rest of the job.



__________________
nealtw is offline  
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Repair rot/wet joist/header joist dlrh Framing and Foundation 4 09-08-2011 07:31 AM
Cutting Floor Joist in Timber Frame jhhaley Framing and Foundation 3 08-04-2011 06:50 PM
joist replacement sikkensuser Framing and Foundation 4 11-04-2010 05:40 PM
Question on floor joist Alonzo Flooring 3 09-13-2010 07:59 PM
Help with Rotten framing bath floor. Aleusia Framing and Foundation 6 10-12-2008 06:13 AM