You more than likely did not go deep enough, I don't know what your frost line is in Ind, but I will bet it is probably 3' or better, and in the winter the frost gets under the footings and moves them, especially if it is a wet area as you say, What you should do is check with the local building dept to see what the required depth of a footing is in your area, then dig your footing to that depth, install a sonatube (cardboard tube for footings) and fill it with concrete, then attach you 4x4 to the top of the concrete.
|