micgall 09-14-2008 05:47 PM

sequence of bathroom fixtures
 
I will be servicing a basement bathroom off of a single supply line leading from a manifold (pex plumbed)
I am wondering if there is a rule of thumb.... ex: keep the toilet at the end of the line...
I will be feeding the shower first, then the toilet, then sink. Shower valve to toilet valve 10', toilet valve to sink about 4'.

Thanks

glennjanie 09-14-2008 09:00 PM

Hello Micgall:
The rule of thumb is 'a half inch line can serve 3 fixtures', and you are within that rule. The fixtures should not interfier with each other in that case.
Glenn

micgall 09-15-2008 08:12 AM

Thanks for the response.