In rehabbing my house (NOWHERE near finished!) I have found that what I think should take an evening, takes about a week. Also, everything costs about 4 time more than I expect! More experienced people can estimate time and cost much more accurately - but, for inexperienced DIY-ers such as myself, be prepared for things to take longer and cost more than what you originally think!



__________________
dthornton is offline  
 
Reply With Quote Quick reply to this message
Old 03-31-2013, 05:39 AM  
oldognewtrick
Moderator
HRT_MODERATOR.png
 
oldognewtrick's Avatar
 
Join Date: Jul 2009
Location: Nashville, TN
Posts: 4,453
Liked 327 Times on 275 Posts
Likes Given: 113

Default

You are correct! The real world is not a half hour home remodel TV show, thats for sure, and it's usually pandoras box.



__________________
oldognewtrick is offline  
dthornton Likes This 
Reply With Quote Quick reply to this message
Old 03-31-2013, 11:05 AM  
drewdin
Junior Member
 
Join Date: Aug 2012
Posts: 389
Liked 23 Times on 21 Posts
Likes Given: 77

Default

I bought my house last July, its still unlivable....

But its 1000% better than when i purchased it, what have you done so far?

__________________
drewdin is offline  
 
Reply With Quote Quick reply to this message
Old 03-31-2013, 06:21 PM  
dthornton
inspector gadget
 
Join Date: Apr 2012
Location: Red Oak, IA, Iowa
Posts: 180
Liked 17 Times on 15 Posts
Likes Given: 84

Default

Oldog ... that's why I love this site. You guys give real world advice. Drew ... well, we've been in the house right at a year. The last people in the house (1890, 2 story, on a full basement with brick foundation) were renters and destroyed the place. 7 windows were broken out, the kids kicked the middle support post on the side porch out (which is why I have to rebuild it), the kitchen was a disaster with no appliances except a stove, the side door had been kicked in and was held shut by a 2X4 across it screwed to the studs, and the upstairs bathroom vanity supply line wasn't connected - they moved out with the water running. It destroyed the plaster ceiling in the dining room, and soaked the cheap carpet in the dining room and living room; which destroyed the hardwood floors underneath.
We first took the kitchen down to the studs and subfloor. I put in new wiring and insulation and backer board on the floor. We had a cabinet maker build us some new cabinets and after he installed them, I put in floor tile and new appliances (kitchen is usable and about 95% complete). We hired plumbers to remove all the iron pipe and put in new PEX (plus a water sediment filter, water softener, and water heater). We went to Lumber Liquidators and bought the red oak hardwood flooring to replace the LR & DR. We hired a pro to remove the old stuff and put down the new, and refinish the rest of the hardwood floors in the house (then we covered them with plastic sheet and cardboard so they won't get damaged). We ripped out the half bath that was adjacent to the dining room and remodeled it (hey - at least we had a toilet. Until that, we had to run down the street to BK, McD, or a gas station!). For 7 weeks, we showered at a neighbor's house (she's definitely an angel!). Upstairs was the full bath and 3 bedrooms. One bedroom was very tiny (adjacent to the "master" bedroom. It shares a common wall (part of it, anyway) with the full bath. We decided to turn the small BR into a bath and closet, to give us a "master suite". So far, I have gotten a tub in and floor tile. That's about it. The main bath had the tub next to the outside wall (under the sloping ceiling.) The shower head was literally about 3 1/2 - 4' above the tub. We worked out a design with the plumber to move everything around (the toilet will go under the sloping ceiling). So I took it down to the floor joists. Every floor joist had been cut (notched out) so I had to sister in some new joists. Will work on that more soon, but we want to get one "complete" bath finished. Hope I haven't bored y'all. So, drew, what's your house story?

__________________
dthornton is offline  
 
Reply With Quote Quick reply to this message
Old 04-26-2013, 12:27 AM  
Frank0
Senior Member
 
Join Date: Jun 2012
Posts: 147
Liked 10 Times on 8 Posts
Likes Given: 24

Default

Open your wallet and the house will take what it needs.



__________________
Frank0 is offline  
nealtw Likes This 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Wallpaper Liner - Share your experiences tqm Walls and Ceilings 2 03-11-2009 12:35 PM
Unico System experiences Sugar Ray HVAC 1 10-13-2008 01:02 PM
Sell Your Own Experiences homebuiler General Home Improvement Discussion 8 05-31-2008 09:21 AM
Vinly siding products and experiences catatonic Roofing and Siding 1 07-29-2007 12:48 PM