I am going to start finishing the lower level of my house but I am stuck on what probably is a simple answer to a question but can't seem to find the answer in any to the books that I own. It is a split level house with slab floor and concrete block that runs 4ft. up. My question is how or what do I attach the top part of the framing so it doesn't topple over when I put the sheetrock on?



__________________
kobelleprop is offline  
 
Reply With Quote Quick reply to this message
Old 04-26-2008, 03:20 PM  
hondadrv24
Senior Member
 
Join Date: Feb 2008
Posts: 188
Liked 1 Times on 1 Posts

Default Yup, Simple Solution

Go buy yourself a low-velocity power nailer from the hardware store. Remington is the only brand that I've seen, you put a .22 shell full of powder and a special nail in it, put it up against the 2x4 and hit it with your hammer(wear ear protection). You will also need this for nailing your baseplate to the concrete but be sure to use the special galvanized coated nails to go through the green treat lumber that you should have at the bottom of your wall.


It's not too expensive the gun should cost you around $20, the shells $5 for a box of 100 and the nails $10 for 100.

Good luck and post pictures and updates so we can see what your doing.



__________________
hondadrv24 is offline  
 
Reply With Quote Quick reply to this message
Old 04-26-2008, 03:23 PM  
hondadrv24
Senior Member
 
Join Date: Feb 2008
Posts: 188
Liked 1 Times on 1 Posts

Default

Or if you plan on running your wall all the way to the bottom of the floor joists you can attach the top plate to the floor joists.

__________________
hondadrv24 is offline  
 
Reply With Quote Quick reply to this message
Old 04-26-2008, 09:31 PM  
kobelleprop
Junior Member
 
Join Date: Apr 2008
Posts: 3
Default

Quote:
Originally Posted by hondadrv24 View Post
Or if you plan on running your wall all the way to the bottom of the floor joists you can attach the top plate to the floor joists.
I don't want to run the studs all the way up as the rest of the wall (4 more Ft.) is resting on a sill on top the the concrete blocks and are already framed, insulated and vapor barrier installed. I will have about a 6" ledge to deal with, but at least I'll have some place to put my beer.
__________________
kobelleprop is offline  
 
Reply With Quote Quick reply to this message
Old 04-26-2008, 09:45 PM  
kobelleprop
Junior Member
 
Join Date: Apr 2008
Posts: 3
Default

Quote:
Originally Posted by hondadrv24 View Post
Go buy yourself a low-velocity power nailer from the hardware store. Remington is the only brand that I've seen, you put a .22 shell full of powder and a special nail in it, put it up against the 2x4 and hit it with your hammer(wear ear protection). You will also need this for nailing your baseplate to the concrete but be sure to use the special galvanized coated nails to go through the green treat lumber that you should have at the bottom of your wall.


It's not too expensive the gun should cost you around $20, the shells $5 for a box of 100 and the nails $10 for 100.

Good luck and post pictures and updates so we can see what your doing.
Just to clarify...I would basically be blocking between 2 studs maybe every 3 or 4 spaces just like I would if I had to frame a wall between floor joists? and if that is true, can I nail into the block or do I have to keep it in the cement seams? Then do I connect it all together from the top (top plate) or sides (wall studs)?
__________________

Last edited by kobelleprop; 04-26-2008 at 09:49 PM.
kobelleprop is offline  
 
Reply With Quote Quick reply to this message
Old 04-27-2008, 11:25 AM  
glennjanie
Senior Member
 
Join Date: Mar 2006
Posts: 2,990
Liked 2 Times on 2 Posts

Send a message via AIM to glennjanie
Default

Welcome Kobelleprop:
I perceive you are framing in front of the 4' high block wall and that there is a ledge exposed on the block wall. If that is the case you could use OSB or plywood on top to extend over onto the blocks, glue and nail it to the blocks in the mortar joints. You can use 1 1/2" concrete nails with the glue and get a good bond. OR use plastic anchors and screws, which would be my choice because the concrete nails may split out of the mortar with all the impact.
If you use strips of finish plywood (oak or birch maybe) you could nail a piece of screen bead on to cover the plies and make it look like a 3/4" finish board.
Let us know if we have all missed the mark, maybe even include some pictures to clarify your dilema.
Glenn



__________________
glennjanie is offline  
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Framing thickness reduction ssharma8 Framing and Foundation 1 07-12-2008 06:47 PM
Framing question GolfnRL Framing and Foundation 6 03-25-2008 03:37 PM
Working Around Old Basement Framing pressureseal Flooring 9 01-17-2008 06:10 AM
split level front to back heating chris1281982 HVAC 5 10-28-2007 07:52 AM
Floor Drain Question for GlennJanie manhattan42 Plumbing Forum 2 07-17-2006 11:46 AM