Hi Guys,
So I just ran two new circuits for a bathroom downstairs. I'm now left with a live wire that's connected to all the lighting in the basement. The wire sticks out of a hole through a beam by about 4 inches. To just leave it in place and terminate it I could just put it in an electrical box with a cover, right?



__________________

10/1/11: Bought the perfect house;11/1/12: 10k & 200 hours into the perfect house; Floors are done and cutting up the cement for the new bathroom that wasn't actually plumbed like the seller said it was; 8/1/13: 30k & 400 hours into the perfect house that only needed new carpet and a coat of paint...
12/1/13: 35k & 500 hours I hope it ends soon
02/1/14: 37k & 550 hours and the inside may be finished soon.

gottodo1 is offline  
 
Reply With Quote Quick reply to this message
Old 02-11-2014, 11:47 AM  
nealtw
Senior Member
 
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 7,773
Liked 548 Times on 495 Posts
Likes Given: 1005

Default

Better would be to go find the other end at the lights or switch in the basement and diconnect it there. Then twist the white and black together in your terminator box so if someone hooks it back up it will blow the breaker.



__________________
nealtw is offline  
 
Reply With Quote Quick reply to this message
Old 02-11-2014, 11:49 AM  
bud16415
Fixer Upper
 
bud16415's Avatar
 
Join Date: Feb 2013
Location: Erie Pa, Pa
Posts: 724
Liked 192 Times on 158 Posts
Likes Given: 70

Default

If it’s unused go find the other end and disconnect it there and pull it out. If you can’t pull it out it will just be a dead wire and you can cut it off and not worry about it. If you put it in a box the box has to come out to the wall and you have to be able to access it thru a cover plate. Can you get those short wires out to a box like that? Do you need an outlet where it’s at?

__________________
bud16415 is offline  
 
Reply With Quote Quick reply to this message
Old 02-11-2014, 07:19 PM  
Wuzzat?
Senior Member
 
Wuzzat?'s Avatar
 
Join Date: Jan 2010
Posts: 1,860
Liked 99 Times on 90 Posts
Likes Given: 56

Default

If you graph the time vs. money and
the time vs. hours
of

10/1/11: Bought the perfect house
11/1/12: 10k & 200 hours into the perfect house; Floors are done and cutting up the cement for the new bathroom that wasn't actually plumbed like the seller said it was
8/1/13: 30k & 400 hours into the perfect house that only needed new carpet and a coat of paint...
12/1/13: 35k & 500 hours I hope it ends soon

the money just takes off like a linear ramp at about 23K per year and, even worse, the hours are increasing slightly exponentially at about 270 hrs/yr.
There is no sign of leveling off.

Don't get pulled into
http://www.google.com/search?client=safari&rls=en&q=sunk+cost+trap&ie=UTF-8&oe=UTF-8
There's nothing like other people's problems to make me forget my own.

__________________
Wuzzat? is offline  
nealtw Likes This 
Reply With Quote Quick reply to this message
Old 02-11-2014, 08:25 PM  
CallMeVilla
Senior Member
 
CallMeVilla's Avatar
 
Join Date: Feb 2010
Location: San Diego
Posts: 1,067
Liked 272 Times on 219 Posts
Likes Given: 108

Default

I had a very similar problem ... somebody had run a light fixture by drilling through an exposed ceiling beam from above during a past remodel. Then they pulled their ROMEX down through the hole.

Owners wanted to hole to go away, especially the wire.

Fortunately, there was additional wiring work adjacent to this mess ... and I located the wire which had powered the thru-the-beam-light. Re-routed the power to a new light, leaving the old one dead.

Trimmed the wire flat to the beam, then pounded it back up as far as possible. Used a plug cutter to cut an exact 3/4" plug and a Forstner bit to drill up into the beam. Glued the plug into the hole, sanded it off, stained to match.

Done. Now you know what YOU need to do!

__________________
CallMeVilla is offline  
oldognewtrick Likes This 
Reply With Quote Quick reply to this message
Old 02-12-2014, 10:45 AM  
gottodo1
Member
 
Join Date: Apr 2013
Posts: 96
Liked 10 Times on 10 Posts
Likes Given: 4

Default

Wuzz, I updated my signature to reflect Feb 1st's total. Notice the slope decreased significantly. I think I've actually got everything I need to finish everything except texturing the walls in the bathroom... but I'm going to hire someone to do that because no matter how many times I try, I' refuse to buy a machine to put the popcorn/texturing on and the cans/rollers just don't match the rest of the house.

__________________

10/1/11: Bought the perfect house;11/1/12: 10k & 200 hours into the perfect house; Floors are done and cutting up the cement for the new bathroom that wasn't actually plumbed like the seller said it was; 8/1/13: 30k & 400 hours into the perfect house that only needed new carpet and a coat of paint...
12/1/13: 35k & 500 hours I hope it ends soon
02/1/14: 37k & 550 hours and the inside may be finished soon.

gottodo1 is offline  
 
Reply With Quote Quick reply to this message
Old 02-12-2014, 10:48 AM  
gottodo1
Member
 
Join Date: Apr 2013
Posts: 96
Liked 10 Times on 10 Posts
Likes Given: 4

Default

All, How do I determine how the crazy previous owner ran this wire? I've opened up all adjacent rooms light switches & light covers and disconnected all but the main branch and it's still energized. The wire looks like it could run to the laundry room which I disconnected both from the light switch and the light box. I'm beginning to think he spliced it into the main branch somewhere I won't be able to access it.

__________________

10/1/11: Bought the perfect house;11/1/12: 10k & 200 hours into the perfect house; Floors are done and cutting up the cement for the new bathroom that wasn't actually plumbed like the seller said it was; 8/1/13: 30k & 400 hours into the perfect house that only needed new carpet and a coat of paint...
12/1/13: 35k & 500 hours I hope it ends soon
02/1/14: 37k & 550 hours and the inside may be finished soon.

gottodo1 is offline  
 
Reply With Quote Quick reply to this message
Old 02-12-2014, 11:05 AM  
CallMeVilla
Senior Member
 
CallMeVilla's Avatar
 
Join Date: Feb 2010
Location: San Diego
Posts: 1,067
Liked 272 Times on 219 Posts
Likes Given: 108

Default

Well ... it is a light so it is probably on a 15A breaker. Attach a light tester to the wire and find the breaker by systematically turning them off one at a time.

Now, find out what else has been shut off. You only need to open those boxes. My suspicion is that there is a concealed junction box in the ceiling.

Idea: Since you are going to hire someone to do your bathroom ceiling (you aren't spraying popcorn, are you?? Bad) why not carve into the basement ceiling to see where your mystery circuit goes? Hell, its only drywall!

Not being flippant here ... "sometimes you have to make a bit of a mess to fix the larger mess." -- Villa's 1st Rule of DIY



__________________
CallMeVilla is offline  
2
People Like This 
Reply With Quote Quick reply to this message
Old 02-13-2014, 10:59 AM  
gottodo1
Member
 
Join Date: Apr 2013
Posts: 96
Liked 10 Times on 10 Posts
Likes Given: 4

Default

CMV,
I'll consider it, I figured that was about what you'd say for cutting holes but I was hoping for something different. I've already isolated the circuit and checked all the nearby locations it could have been fed in so it'll probably be alot of a mess. I just really hate texturing things to match because it never QUITE looks right if I do it myself.

The guy I want to hire will probably spray popcorn on as that is what the rest of the basement has. Also here they use "orange peel" on the walls... I miss my AZ house with stucco and real texturing but it is what it is.



__________________

10/1/11: Bought the perfect house;11/1/12: 10k & 200 hours into the perfect house; Floors are done and cutting up the cement for the new bathroom that wasn't actually plumbed like the seller said it was; 8/1/13: 30k & 400 hours into the perfect house that only needed new carpet and a coat of paint...
12/1/13: 35k & 500 hours I hope it ends soon
02/1/14: 37k & 550 hours and the inside may be finished soon.

gottodo1 is offline  
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Converting a staircase from open on 1 side, to open on 2 sides. frozensneaker Carpentry and Woodworking 5 11-17-2013 01:53 PM
Open Ground david542 Electrical and Wiring 12 03-07-2012 11:20 AM
Open rafter ceiling cnelson0131 Insulation and Radiant Barriers 3 06-19-2011 09:20 PM
i have an open ground.. mundo Electrical and Wiring 3 05-15-2011 07:35 AM
Door swings open tomf Windows and Doors 5 12-20-2007 08:27 AM