Quattro
Gift Premium Subscription To Quattro
Join Date:
10-10-2006Last Activity:
11-30-2012 10:07 PM- two-wheeled enlightenment
- BK
ABOUT ME
LATEST ACTIVITY
Posted in thread: New Coleman/York furnace blower erratic on 11-29-2012 at 08:12 PM
Supplier thinks its the motor. Sending me a replacement. Hopefully I can get it shoehorned in!Posted in thread: New Coleman/York furnace blower erratic on 11-25-2012 at 07:15 AM
It's one possibility.Normal failures may take years but early failures due to factory-caused
defects are called "infant mortality".Here are some photos! Could the thermostat have anything
to do with t...Posted in thread: New Coleman/York furnace blower erratic on 11-24-2012 at 09:05 PM
How do you test across the contacts while the relay is socketed on the board? How likely is it
that a brand new furnace needs a new relay?Edit: I don't see any relays on the board. At least
not "conve...Posted in thread: New Coleman/York furnace blower erratic on 11-24-2012 at 08:54 PM
Thanks for the tip! However, I'm not sure I know where that relay is, or which contacts to
measure. I do know how to use my DMM, though!Posted in thread: New Coleman/York furnace blower erratic on 11-24-2012 at 08:18 PM
Hey all, it's been a while, but I'm back with a new question. Thanksgiving morning I installed
(with the help of my retired-HVAC-instructor father-in-law) a new gas furnace in my house.
Everything wen...Posted in thread: basement ceiling on 04-02-2010 at 08:19 PM
Is it really "much" cheaper? Materials wise, yes...but the labor of taping, mudding, sanding,
priming and painting probably brings it closer. I agree it does look better though. I did not
want to give...Posted in thread: basement ceiling on 03-31-2010 at 12:41 PM
Will do. Hope to have it done before winter! :-)Posted in thread: basement ceiling on 03-29-2010 at 02:35 PM
I have a bunch of Ceiling Link waiting to be installed in my basement. Looks good. Just need to
finish the walls before putting it up.Posted in thread: New to tiling...doing a glass mosaic tile backsplash on 03-24-2010 at 08:03 AM
If I do that, I'd have to wait until each course has cured before doing another course on top,
right? I'm thinking of the area behind the range hood, which will go from counter top to
ceiling.Posted in thread: New to tiling...doing a glass mosaic tile backsplash on 03-16-2010 at 06:37 PM
Thanks for the tips! Fortunately, we'll only be going 1/2 way up to the bottom of the cabinets.
I think there is a 1/4" height difference over the course of 8 feet. Not too bad.I have a
plastic rafter...
Leave CommentNewest Threads
- Floor Drain for AC Condensate Discharge
- Carrier HVAC - Fan not turning
- What's that smell?
- Transistion problem
- Musky smelling rugs
- Builder's Joke Thread
- One Word Game
- Popping tiles
- Can you tell me what it is called, please?
- wiring thermostat
- Stucco Job
- Stainless Steel Fridge
- moisture from missing singles at roof peak?
- Shower pan
- Tub soft spots
- My cat is a moron, again





Browse Members
Register