VIEW MY

shadetree

Gift Premium Subscription To shadetree

Join Date:

08-31-2011

Last Activity:

09-14-2011 1:52 PM

  • Austin
  • TX

LATEST ACTIVITY

  • Posted in thread: Replacing support post on 09-01-2011 at 10:58 PM
    The post in it's new position seems like it would be carrying less weight because most of the
    load would rest on the pillar that is going where the post currently is now (near the center of
    the beam)....

  • Posted in thread: Replacing support post on 09-01-2011 at 09:17 PM
    The beam is 3 2x12s nailed together, it's 25ft long. The post is 83" from the foundation to the
    bottom of the beam and is 3" in diameter.I wasn't planning on altering the slab below the post
    in it's n...

  • Posted in thread: Replacing support post on 09-01-2011 at 03:25 PM
    Mostly cost, availability and ease of use. I can pick up concrete bricks for around 30 cents
    each and get the whole pillar built built for about $60. I have no welding equipment, nor a
    proper grinder ...

  • Posted in thread: Replacing support post on 09-01-2011 at 12:41 AM
    Replacing support postThe back storage addition to my new home has a post supporting the
    central beam that worries me. The post is out of alignment, with the bottom of the post about a
    half inch offse...

0 COMMENTS
POST A COMMENT