Quantcast

HomePhotos7000sqftcustom

7000sqftcustom

  • Title  
  • Date Uploaded  
  • Views  
Prev12Next
  • thumb1_25-26
  • Utility room.

  • thumb1_33-34
  • This is where the main service will be.

  • thumb1_32-33
  • This basement closet will house the lighting control panels and elevator equipment.

  • thumb1_8-8
  • These are telephone, television and data media panels. Security panel is on right wall.

  • thumb1_34-35
  • The lower garages.

  • thumb1_6-6
  • The cans in ceiling are 4" low-voltage by LITON. They're hung in pairs of two everywhere on upper floor.

  • thumb1_13-14
  • Subpanels in utility room.

  • thumb1_7-7
  • Pool.

  • thumb1_24-25
  • Pool.

  • thumb1_17-18
  • Pool equipment room.

  • thumb1_30-31
  • Pool equipment room.

  • thumb1_19-20
  • Main service, 400 amps.

  • thumb1_20-21
  • Lower garages after driveway pour.

  • thumb1_10-11
  • Lighting subpanel and control panels.

  • thumb1_12-13
  • Lighting control panels.

Prev12Next
All Sponsors:

Newest Threads

  • Shower pan
  • Need opinions on what to do here... (Pics Included)
  • Possible mold problems??
  • Need some help
  • Sistering floor joists in my hunting cabin to stop floor movement
  • Looking for new HVAC and move furnace?
  • Completed Sanding, two questions before applying urethane finish.
  • Install Quarter Round when there is large gap underneath the baseboard?
  • Exhaust Fan In Bathroom
  • One Word Game
  • Installing new garbage disposal
  • Kitchen Faucet
  • Funny Pictures and stories....
  • Lawnmower Question
  • Musky smelling rugs
  • Water damage from a ceiling leak
FOLLOW US ON
Contact
-
Top
-
TOS
-
Privacy
-
Advertising
Copyright © Group Builder, Inc - All Rights Reserved
Advertise Here