Hi Everyone,
What's the best way to minimize frost heave and any cracking in the following situation:
I'm building a shed on a 9' x 10' concrete slab foundation. The frost line here is about 3'6" below grade, but I don't really want to dig that far down.
The "footing" will only be about a foot deep and the slab will be 4" thick. The entire foundation will be poured over 4" of gravel. I've included a picture that shows more or less what I'm planning.
Does anyone have any good ideas?
Thanks!
What's the best way to minimize frost heave and any cracking in the following situation:
I'm building a shed on a 9' x 10' concrete slab foundation. The frost line here is about 3'6" below grade, but I don't really want to dig that far down.
The "footing" will only be about a foot deep and the slab will be 4" thick. The entire foundation will be poured over 4" of gravel. I've included a picture that shows more or less what I'm planning.
Does anyone have any good ideas?
Thanks!