I am planning to have a concrete floor poured in my existing 25' x 24' pole barn. Barn is about 30 years old so it doesn't have any settling occurring. Contractor plans to pour 5 inches of 4,000 PSI concrete with rebar reinforcement on top of a compacted gravel base. The current dirt floor will need to be dug down 8 - 10 inches, and then 3-5 inches of gravel brought in and compacted and then 5 inches of concrete on top of that. I have some questions/concerns that I wanted to get some feedback on. I attached a few pictures for reference.

1. Should a vapor barrier be put down between the gravel and concrete? Contractor didnt mention about doing this so I want to ask.

2. I believe that to bring the floor to the correct height so my garage doors still close properly the concrete will come up a few inches along the perimeter skirt boards (which effectively will also be used as forms I believe). Should I brace the outside of the boards to prevent the boards from bowing out when the concrete is being poured?

3. Do I need to be concerned about concrete being poured under the skirting boards and then any heaving during the winter months (I live in upstate NY) causing the boards to heave upwards? Would the compacted gravel underneath prevent the concrete from migrating under the boards?

4. Along the posts that protrude into the inside, should I apply any type of expansion strips (felt/tar paper) along the bottom where the concrete contacts the post, to allow for movement of the concrete?

Thanks very much for your feedback!


Click image for larger version

Name:	IMG_20170705_100307021_HDR.jpg
Views:	91
Size:	104.0 KB
ID:	14261   Click image for larger version

Name:	IMG_20170705_100423996.jpg
Views:	89
Size:	84.7 KB
ID:	14262   Click image for larger version

Name:	IMG_20170705_100452766.jpg
Views:	85
Size:	104.1 KB
ID:	14263  
kdrymer is offline  
 
Reply With Quote
Old 07-05-2017, 11:21 AM  
Wuzzat?
Senior Member
 
Wuzzat?'s Avatar
Join Date: Jan 2010
Location: , Western Hemisphere, N of the equator
Posts: 2,358
Liked 168 Times on 155 Posts
Likes Given: 95

Default

Disclaimer: I am not a civil engineer so this is merely my two cents.

You seem to be the curious type. Have at it. . .
http://www.eng-tips.com/viewthread.cfm?qid=392549

You might also search
"coefficient of expansion"
for concrete.

The deeper you look, the more questions pop up.
Get at least three bids.
The things each contractor will say will all sound reasonable and they may all say different things.
You'll learn more with each bid.
No contract will say, "We guarantee to solve your problem." They'll say, "We will furnish and install. . .".

I've heard of one contract where the HO was supposed to guarantee that the contractor would solve the HO's problem (a cracked basement floor within the 10 year warranty on the house).

Good luck.



Last edited by Wuzzat?; 07-05-2017 at 11:26 AM.
Wuzzat? is offline  
 
Reply With Quote
Old 07-05-2017, 11:43 AM  
nealtw
Contractor retired
 
nealtw's Avatar
Join Date: Nov 2010
Location: Upper Fraser Valley, British Columbia
Posts: 23,445
Liked 2947 Times on 2583 Posts
Likes Given: 4855

Default

If you are using that bottom board for forms you will need to drive a stake every 3 ft around the building about 2 ft from the building and then cut a 2x4 to fit tightly between the stake and the board.
nealtw is offline  
 
Reply With Quote
Old 07-05-2017, 12:08 PM  
bud16415
Fixer Upper
HRT_ADMIN.png
 
bud16415's Avatar
Join Date: Feb 2013
Location: Erie Pa, Pa
Posts: 4,355
Liked 1447 Times on 1107 Posts
Likes Given: 779

Default

He won’t be using the bottom ring as a form as the bottom of that piece is his finished floor height the way I understand it.
I’m no expert they should be around.
I personally would use it as the form and have a little ramp outside the doors coming in. that’s how we did my nephews and we put a small grade to it so water runs out the door. If not that I would slope it slightly to the center and have a couple floor drains. I have seen guys spray the outside frame down with used oil so as to not get a bond or tack up the half inch thick tar board for the outside edge and around the poles. I would use the mesh instead of rebar but make sure they pull it up after the pour. With pouring on top you would have to adjust the door height though.

My guess is after 30 years your bank gravel floor is pretty well compacted.

Let’s see what the pros say.
bud16415 is offline  
 
Reply With Quote
Old 07-05-2017, 12:30 PM  
kdrymer
Member
Join Date: Aug 2014
Posts: 84
Liked 4 Times on 4 Posts
Likes Given: 2

Default

Yes the bottom of the board is approximately the level of the existing dirt floor, as you can see in the corner picture with the garage door track. So I assume they would need to bring in their own forms to be below the inner edge of the skirt board...

Should I wrap the bottom of the posts with any kind of expansion strips? In addition to allowing for movement it would prevent concrete from directly touching the posts and potentially cause moisture issues I would think?
kdrymer is offline  
 
Reply With Quote
Old 07-05-2017, 12:52 PM  
nealtw
Contractor retired
 
nealtw's Avatar
Join Date: Nov 2010
Location: Upper Fraser Valley, British Columbia
Posts: 23,445
Liked 2947 Times on 2583 Posts
Likes Given: 4855

Default

I would be putting underground treated 2x4 against the post for forms that would be left in place. The space to the outside wall can be covered with a bit of gravel or a skim coat of concrete.
If you ever have to change a post it could be done from the outside with out disturbing the floor.
I don't know enough about expansion to get into that.
nealtw is offline  
Sparky617 Likes This 
Reply With Quote
Old 07-21-2017, 07:01 AM  
kdrymer
Member
Join Date: Aug 2014
Posts: 84
Liked 4 Times on 4 Posts
Likes Given: 2

Default

Thanks all for the feedback! It turned out great!


kdrymer is offline  
nealtw Likes This 
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Insulating Pole Barn?t papakevin Insulation and Radiant Barriers 6 07-14-2014 09:00 PM
Building a pole barn - size and pitch suggestions needed please thegogetter222 Framing and Foundation 8 06-10-2014 05:08 PM
Using a pole barn for a roof? Spongiform Roofing and Siding 4 09-14-2011 10:50 PM
Pouring concrete in dirt floor basement of old home ecrhone Bricks, Masonry and Concrete 10 01-20-2010 07:23 PM
Heating a Pole Barn Cabin mickeymoondawg HVAC 3 01-25-2007 08:07 PM