Old 03-22-2014, 02:14 PM  
SilentGloves
Junior Member
 
Join Date: Mar 2014
Posts: 5
Liked 1 Times on 1 Posts

Default Basement Remodel - Removal of Existing Framing Questions

Good Afternoon Everyone,

I apologize if this is the wrong forum, since this involves multiple topics (concrete, framing, etc.) I figured it was best placed here. Move as necessary.

I am a relatively new homeowner, and I am embarking on a likely multi-year project to re-finish my basement. I bought the home from a refurbisher, and he had ripped out most of the dated finish work in the basement. However, he left the existing framing (from the 70s), which is shoddy at best, and has some water-related rot.

I have at least one area where there is water coming in from behind the framing on an outer wall. It seems like the best bet is to just tear it all out, do the concrete repairs, and start from scratch to do it correctly. However, after close examination, I've discovered at least a couple roadblocks that leave me with questions. Your advise is welcome and appreciated. I have included several pictures.

1. The outer wall framing appears to be anchored to the concrete walls with rather large flathead fasteners. How much trouble am I asking for in trying to remove these?

2. The basement is a daylight basement. The rear wall is half concrete, and half lumber. The internal framing is ripped 2x4s attached to the structural framing. How can I safely remove the inner framing without damaging the structural framing?

Thanks!









__________________
SilentGloves is offline  
 
Reply With Quote Quick reply to this message
Old 03-23-2014, 10:41 PM  
nealtw
Contractor
 
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 10,980
Liked 965 Times on 858 Posts
Likes Given: 1650

Default

Welcome to the site. The screws should come out with a screwdriver. They are likely screwed into lead, plastic or wood plugs in the concrete. I would just cut the lower stuff off about 6" above the concrete and leave the upper stuff there. Then when you replace the wall you can build a short wall up to meet that height or go right to the ceiling.The new wall should be 1" away from the concrete and of coarse the vapour barrier will be moved to be next to the drywall.
For nails and screws that don't want to come out get a Bear Claw Nail Puller, 13" at the lumberyard.



__________________
nealtw is offline  
 
Reply With Quote Quick reply to this message
Old 03-24-2014, 09:18 AM  
SilentGloves
Junior Member
 
Join Date: Mar 2014
Posts: 5
Liked 1 Times on 1 Posts

Default

Quote:
Originally Posted by nealtw View Post
Welcome to the site. The screws should come out with a screwdriver. They are likely screwed into lead, plastic or wood plugs in the concrete.
Thanks. That was my thinking as well. But no, they were non-masonry screws screwed directly into the concrete. and at least in one area, quite rusted. I removed the first 6 or so furring strips and only had to pull out the sawzall to cut one screw. Then, however, the original installer decided that screws were too much trouble and that nails and gobs of epoxy were more appropriate.

Quote:
Originally Posted by nealtw View Post
I would just cut the lower stuff off about 6" above the concrete and leave the upper stuff there. Then when you replace the wall you can build a short wall up to meet that height or go right to the ceiling.The new wall should be 1" away from the concrete and of coarse the vapour barrier will be moved to be next to the drywall.
I'm afraid you're too late. It's about 3/4 removed now.

I though about building a new wall in front of the existing furring strips, but that just doesn't sit right with me. Feels like a shortcut, and I didn't really know the condition of the concrete. Now that I've pulled most of it out, at least on that wall, I can repair the small holes in the concrete, put in a proper vapor barrier, rigid foam and then frame it in properly. Now that I've started, I feel the few days of extra work will be worth knowing it's done correctly.

Quote:
Originally Posted by nealtw View Post
For nails and screws that don't want to come out get a Bear Claw Nail Puller, 13" at the lumberyard.
A combination of a big-*** screwdriver and a crescent wrench for leverage did the trick nicely.

Thanks for your advice!
__________________
SilentGloves is offline  
 
Reply With Quote Quick reply to this message
Old 03-24-2014, 09:26 AM  
DFBonnett
Member
 
Join Date: Apr 2012
Posts: 78
Liked 19 Times on 19 Posts
Likes Given: 11

Default

OP,
FWIW, that water situation might be resolved by something as simple as rerouting the leaders from the gutters outside.

__________________
DFBonnett is offline  
 
Reply With Quote Quick reply to this message
Old 03-24-2014, 09:33 AM  
SilentGloves
Junior Member
 
Join Date: Mar 2014
Posts: 5
Liked 1 Times on 1 Posts

Default

Quote:
Originally Posted by DFBonnett View Post
OP,
FWIW, that water situation might be resolved by something as simple as rerouting the leaders from the gutters outside.
Hey, yes. I cleaned out the gutters and made sure the downspouts were clear back in the early fall of last year. Since it's a daylight basement, there is a significant grade moving downward and away from the home, I just had an issue with a backed-up downspout overflowing right there. I haven't had any water intrusion since cleaning out the gutters. If nothing else, though, I'd like to at least have that crack injection sealed.
__________________
SilentGloves is offline  
 
Reply With Quote Quick reply to this message
Old 03-24-2014, 02:42 PM  
nealtw
Contractor
 
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 10,980
Liked 965 Times on 858 Posts
Likes Given: 1650

Default

To follow DFBonnetts lead most time it is better to fix the water problems on the outside. Down spouts often run into the perimeter drain and overload it, soil should slope away from the house and you should have 6 to 8" of exposed concrete foundation on the outside.
I didn't mean to leave the wood against the concrete just the stuff agains the wall above if you have any.
When you build the new wall 1" away from the concrete you should firestop the gap at the top so a fire in the wall can't sneak into the floor joists. When we doi this we use a 2x? against the wood plate at the top of the wall as a spacer and then build the wall against that spacer and level the wall down to the floor.

Any wood that is going to touch concrete wall or floor needs to have something between the two. sill gasket or poly, even tar paper.

__________________
nealtw is offline  
 
Reply With Quote Quick reply to this message
Old 03-24-2014, 10:33 PM  
SilentGloves
Junior Member
 
Join Date: Mar 2014
Posts: 5
Liked 1 Times on 1 Posts

Default

Quote:
Originally Posted by nealtw View Post
To follow DFBonnetts lead most time it is better to fix the water problems on the outside. Down spouts often run into the perimeter drain and overload it, soil should slope away from the house and you should have 6 to 8" of exposed concrete foundation on the outside.
Noted. I have a daylight basement, so the rear grade is about 5' below the front. The grade around the house slopes away, and I have about 12" of exposed concrete on that side. All of that is pretty much already in order, and once I cleared the gutters and downspouts, I haven't had any water intrusion, even after all the snowfall and melt we've had here in Ohio. I'm certain the water intrusion issue is resolved. I will likely have an acquaintance contractor inject the crack with urethane just as a little bit of additional piece of mind, but as long as I keep that downspout clear, I shouldn't have any other issues.

Quote:
I didn't mean to leave the wood against the concrete just the stuff agains the wall above if you have any. When you build the new wall 1" away from the concrete you should firestop the gap at the top so a fire in the wall can't sneak into the floor joists. When we doi this we use a 2x? against the wood plate at the top of the wall as a spacer and then build the wall against that spacer and level the wall down to the floor.
That's good to know. I believe what you're referring to is an extension of the sill plate that sits on top of the foundation. I can rip 2x4s to the width of the foam and install that at the top against the sill plate as a fire-stop.

Quote:
Any wood that is going to touch concrete wall or floor needs to have something between the two. sill gasket or poly, even tar paper.
There likely won't be any wood touching concrete. Vapor sealed rigid foam will sit against the concrete wall, and the framing will sit outside of that. The framing will be attached at the joists, and secured to the floor with tapcon anchors.

Good information, thanks.
__________________
SilentGloves is offline  
 
Reply With Quote Quick reply to this message
Old 03-24-2014, 11:04 PM  
slownsteady
Supporting Member
HRT_SUPPORTER.png
 
slownsteady's Avatar
 
Join Date: Jun 2009
Location: Newton, NJ
Posts: 1,425
Liked 226 Times on 189 Posts
Likes Given: 278

Default

Quote:
Any wood that is going to touch concrete wall or floor needs to have something between the two. sill gasket or poly, even tar paper.
What do you think about laying a piece of solid PVC trim board down under the sole plate when building a basement wall? Maybe not so much under a load-bearing wall, but would this be a good separation between wood & concrete? I can see something like a 3/4" X 3 1/2" X 8' as a possibility (maybe even thinner if available).
__________________
slownsteady is offline  
 
Reply With Quote Quick reply to this message
Old 03-24-2014, 11:12 PM  
slownsteady
Supporting Member
HRT_SUPPORTER.png
 
slownsteady's Avatar
 
Join Date: Jun 2009
Location: Newton, NJ
Posts: 1,425
Liked 226 Times on 189 Posts
Likes Given: 278

Default

Quote:
I haven't had any water intrusion since cleaning out the gutters. If nothing else, though, I'd like to at least have that crack injection sealed.
Depending on where you live, it can be a seasonal water problem. No trouble in the summer, or when the ground is frozen, but a good heavy rain on top of a spring thaw can really test the foundation. Add melting snow to that just for fun.
If those circumstances are present, take your time and don't button up the wall till you're sure the leak is not a problem.
__________________
slownsteady is offline  
 
Reply With Quote Quick reply to this message
Old 03-24-2014, 11:42 PM  
nealtw
Contractor
 
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 10,980
Liked 965 Times on 858 Posts
Likes Given: 1650

Default

Plastic under the plate on the floor too, all wood touching the floor should have it. Sometimes when you build the wall away from the foundation you find the the concrete has some curves and the wall get pretty close, if they touch protect the wood with plastic.



__________________
nealtw is offline  
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Living Room Remodel - Header/Framing Question infidex Framing and Foundation 8 06-24-2013 01:06 PM
New Framing/Foundation Plan for Existing Addition GeoffM Framing and Foundation 19 05-11-2012 05:00 PM
Help with framing existing wall brasilmom Walls and Ceilings 1 05-31-2009 09:04 AM
Bathroom remodel questions. Dan208 General Home Improvement Discussion 0 05-15-2009 11:14 AM
Framing questions Terp Framing and Foundation 4 05-19-2008 04:24 PM

Newest Threads

LATEST SPONSOR DEALS