DIY Home Improvement, Remodeling & Repair Forum > DIY Home Improvement > Framing and Foundation > Level first?




Help Support House Repair Talk by donating using the link above.
Reply
 
Thread Tools Search this Thread
Old 01-20-2009, 07:52 AM  
sequimrehab
Junior Member
Join Date: Jan 2009
Posts: 9
Default Level first?

I need to level my house,but i also need to have the old wiring replaced.
Do i need to wait until the house is leveled first or can i have the elecrical done first.


sequimrehab is offline  
 
Reply With Quote
Old 01-20-2009, 12:54 PM  
inspectorD
Housebroken
HRT_ADMIN.png
 
inspectorD's Avatar
Join Date: Dec 2005
Location: Litchfield, CT
Posts: 4,486
Liked 262 Times on 206 Posts
Likes Given: 762

Default Well

Level first, then fix any plumbing waste lines which may no longer have any pitch downhill, then do electrical last.
__________________
Just My
Made in the
inspectorD is offline  
 
Reply With Quote
Old 01-20-2009, 06:31 PM  
sequimrehab
Junior Member
Join Date: Jan 2009
Posts: 9
Default

Thank you,
Now at least I know what to save for first.
sequimrehab is offline  
 
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Tub Not Level AWD_GS Plumbing Forum 26 04-19-2016 10:27 PM
Level 5 Finish SPISurfer Flooring 1 03-06-2009 07:49 PM
how level do i need to be? nashville_broker Flooring 2 10-29-2005 08:35 PM
level floor artdeco Flooring 2 09-30-2005 08:40 AM