I don't want to run the studs all the way up as the rest of the wall (4 more Ft.) is resting on a sill on top the the concrete blocks and are already framed, insulated and vapor barrier installed. I will have about a 6" ledge to deal with, but at least I'll have some place to put my beer.:D