Search results

House Repair Talk

Help Support House Repair Talk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. K

    Split-Level Framing Question

    Just to clarify...I would basically be blocking between 2 studs maybe every 3 or 4 spaces just like I would if I had to frame a wall between floor joists? and if that is true, can I nail into the block or do I have to keep it in the cement seams? Then do I connect it all together from the top...
  2. K

    Split-Level Framing Question

    I don't want to run the studs all the way up as the rest of the wall (4 more Ft.) is resting on a sill on top the the concrete blocks and are already framed, insulated and vapor barrier installed. I will have about a 6" ledge to deal with, but at least I'll have some place to put my beer.:D
  3. K

    Split-Level Framing Question

    I am going to start finishing the lower level of my house but I am stuck on what probably is a simple answer to a question but can't seem to find the answer in any to the books that I own. It is a split level house with slab floor and concrete block that runs 4ft. up. My question is how or what...
Back
Top