DWV Tie in, Cleanout plug or Wye into 3" Line

Discussion in 'Plumbing Forum' started by Housedoctor57, Sep 24, 2012.

  1. Sep 24, 2012 #1

    Housedoctor57

    Housedoctor57

    Housedoctor57

    Active Member

    Joined:
    Mar 2, 2010
    Messages:
    40
    Likes Received:
    4
    Tying my ejector pump 2" line into DWV. I have attached a picture of a cleanout in the 3" line very close to where the pump is located. The 2" line from the pump will be higher than this cleanout plug before I make the 90 degree turn towards the waste line. Will this be a good option to cutting into the DWV pipe a few feet down with a 2" sanitary/3" coupling with FERNCO fittings?

    DWV Cleanout.jpg
     
  2. Sep 30, 2012 #2

    Housedoctor57

    Housedoctor57

    Housedoctor57

    Active Member

    Joined:
    Mar 2, 2010
    Messages:
    40
    Likes Received:
    4
    I found a 3" slip coupling while picking out all my fittings. It worked great. Better than messing with the clean out. I used the slip coupling and took back the Fernco rubber fittings. Slip coupling definitely the way to go:D

    20120928_123705(1).jpg
     

Share This Page