    My panel is in the ban and I would like change the location of it while I keep the power for my pool and my garage. Any ideas would be appreciated. Thanks
     
  2. Sep 21, 2012 #2

    JoeD

    JoeD

    JoeD

    Well-Known Member

    Joined:
    Mar 16, 2006
    Messages:
    1,528
    Likes Received:
    273
    Rent a generator for temporary power while you replace the old service in the barn.
     
  3. Sep 22, 2012 #3

    CallMeVilla

    CallMeVilla

    CallMeVilla

    Well-Known Member

    Joined:
    Feb 9, 2010
    Messages:
    1,651
    Likes Received:
    594
    Moving the panel should not take that long anyway if you (or someone else) knows how to do it. Your big problem will be with the City/Utility people getting there to permit it and turn it off/on.

    JoeD is correct because those bureaucrats might take weeks . . . plan for the worst. :D
     
  4. Sep 22, 2012 #4

    Wuzzat?

    Wuzzat?

    Wuzzat?

    Well-Known Member Sponsor

    Joined:
    Jan 20, 2010
    Messages:
    2,471
    Likes Received:
    175
    In your own house panel are you allowed to get a large Allen wrench and disconnect the three conductors coming in (after you put on level 2 arc flash PPE)?
     
  5. Sep 23, 2012 #5

    CallMeVilla

    CallMeVilla

    CallMeVilla

    Well-Known Member

    Joined:
    Feb 9, 2010
    Messages:
    1,651
    Likes Received:
    594
    You have to disconnect the lugs on a panel upgrade or relocation, either way. The overhead service connects at the weatherhead and your panel conductors take over from there.

    I woud imagine David will do all the prep work before having the main service disconnected. That would include positioning the new panel and the new weatherhead plus the main connectors to the lugs. Then, with all the service discinnected, e might even pull new circuit wires and existing to the new panel and connect all breakers.

    All that being done, he can run his backup generator until the Inspector gets his (you knw what) out there for final approval . . . then he has to wait for the utility poeple to do their thing.

    Lotsa fun, huh?:D
     