    Hello, we are getting ready to install a new tile floor. Want to use ditra and the heated floor mat.
    Questions:
    Do we install the mat or ditra first?
    Only wanted to use the floor mat in certain areas. Can we do that?
    If so, can we build up the thinset so the floor remains even where there is no mat?
    Appreciate your help.
     
  2. Jan 26, 2014 #2

    CallMeVilla

    CallMeVilla

    CallMeVilla

    Well-Known Member

    Joined:
    Feb 9, 2010
    Messages:
    1,651
    Likes Received:
    594
    Last edited: Jan 26, 2014
  3. Jan 26, 2014 #3

    joeyL

    joeyL

    joeyL

    Member

    Joined:
    Mar 24, 2013
    Messages:
    13
    Likes Received:
    0
    Thank you! I was hoping I could do the mat like this.
     
  4. Jan 28, 2014 #4

    joeyL

    joeyL

    joeyL

    Member

    Joined:
    Mar 24, 2013
    Messages:
    13
    Likes Received:
    0
    One more question (so far)... We have 5/8" subfloor, 10" joists, 16" oc. Can't see the length. I see where some installers state that you can get away with 3/4" subfloor under 12x12 porcelain tile. If we use the 1/8" Ditra, does that make the subfloor adequate or does the subfloor need to be 3/4" prior to the Ditra? If not, can we use the Ditra XL to compensate. We will do what is correct, but hoping the XL would work. :)
     
  5. Jan 30, 2014 #5

    Jaz

    Jaz

    Jaz

    Ceramic Tile Pro - retired

    Joined:
    Mar 21, 2006
    Messages:
    87
    Likes Received:
    19
    Joey,

    Please note that CallMeVilla got the info backwards. The warming mats go in first, then ditra over.

    If everything was done right and still in good condition, 5/8" @ 16" oc meets minimum standards. (thank you cheap-*** builder for using 5/8") :eek:

    You should be able to figure what the span is for the joists, you don't haveta see them to know where they are. You can use regular Ditra, but if you can find it, Ditra XL is preferred.

    Jaz
     
  6. Feb 4, 2014 #6

    joeyL

    joeyL

    joeyL

    Member

    Joined:
    Mar 24, 2013
    Messages:
    13
    Likes Received:
    0
    Thanks Jaz. We ended up adding 3/8" plywood over the existing subfloor. When the existing flooring was removed, the subfloor looked like it needed some help. :) We will start tiling in a few days. Looking forward to this project being completed!
     