Need to upgrade (replace) a bolt-on-lug sub-panel

House Repair Talk

Help Support House Repair Talk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

Hamberg

Supporting Member
Supporting Member
Joined
Mar 3, 2021
Messages
193
Reaction score
92
Location
Horsham PA
Short version...

Need to update a bolt-on-lug sub-panel and would like to know if there is any reason (code wise? NEC 2014 in our area) not to replace it with a breaker sub panel?

Currently the sub panel is directly adjacent to the main (see pics) and I can see why they didn't use a breaker panel, but in my (feeble) mind a breaker panel would add an extra level of safety (in that it would allow that whole "zone" to be shut down, from that panel - which I know is the exact same as flipping the sub breaker in the main panel)
 

Attachments

  • IMG_0231.jpg
    IMG_0231.jpg
    67.4 KB · Views: 6
  • IMG_0232.jpg
    IMG_0232.jpg
    41.2 KB · Views: 6
  • IMG_0233.jpg
    IMG_0233.jpg
    57.7 KB · Views: 6
  • IMG_0234.jpg
    IMG_0234.jpg
    99.3 KB · Views: 6
  • IMG_0235.jpg
    IMG_0235.jpg
    92 KB · Views: 6
  • IMG_0236.jpg
    IMG_0236.jpg
    89.3 KB · Views: 6
Both of my sub panels are controlled by 100 amp breakers in the main panel under the meter. When my house was built in 1998 the main panel under the meter (one cabinet) the code didn't require a main breaker for the service. My main panel has breakers for the AC outdoor units, the range, a 50 amp EV circuit I just added and the two sub panels.
 
OP, add on...

sub-panel pictured was added 10 years ago when we had an addition built. That panel is full with one tandem breaker, (what I noticed today) the main panel has 3 double taps (??) and I need to add a sub-panel in the garage for light/outlet circuits and a 60amp heater, plus we are adding a shed that'll need a sub-panel as well (30 amp).

My thought was to replace the pictured sub with a 125 amp, 30+ circuit panel, move as many single breaker circuits as I can from the original main and run the sub-panels and 240v circuits from the main.

How's my logic?
 