New Roof

Discussion in 'Roofing and Siding' started by markp7575, Jan 16, 2009.

Help Support House Repair Talk by donating using the link above.
  1. Jan 16, 2009 #1

    markp7575

    markp7575

    markp7575

    New Member

    Joined:
    Jan 16, 2009
    Messages:
    3
    Likes Received:
    0
    I'm having a new roof put on due to hurricane Ike. I noticed the crew that was sent over is simply taking off the old shingles and then laying new tarp paper over the old tarp paper before putting on the new shingles.

    Is this a normal practice?

    They did in fact replace one peice of plywood so far on the back of the house. when I asked how they knew to replace it, they said they could feel the sag with their feet. Shouldn't they also take up all the old tar paper to know if there is damage underneath?
     
  2. Jan 16, 2009 #2

    Daryl in Nanoose

    Daryl in Nanoose

    Daryl in Nanoose

    Well-Known Member

    Joined:
    Feb 3, 2006
    Messages:
    769
    Likes Received:
    9
    absolutely yes
     
  3. Jan 16, 2009 #3

    markp7575

    markp7575

    markp7575

    New Member

    Joined:
    Jan 16, 2009
    Messages:
    3
    Likes Received:
    0
    Yes, this is a normal practice? Or, yes, they should take up the old tar paper?
     
  4. Jan 16, 2009 #4

    inspectorD

    inspectorD

    inspectorD

    Housebroken Staff Member Admin Moderator

    Joined:
    Dec 17, 2005
    Messages:
    4,503
    Likes Received:
    267
    Take off all tar paper so you can inspect what is underneath. I can't see how it did not come off with the shingles, Every roof we do everything comes off, Then fix what you see is delaminated or wet.
    Good luck, sounds like you have a fly by night crew.
     
  5. Jan 16, 2009 #5

    jaros bros.

    jaros bros.

    jaros bros.

    Member

    Joined:
    Jan 14, 2009
    Messages:
    17
    Likes Received:
    0
    Definitely need to take off the old tar paper to see what's underneath. I would think that it would be extremely hard to see if all the nails were removed before putting down the new tar paper. Seems to me that you would risk compromising the new paper if you tore and punctured it a lot on the old nails that you missed. Taking everything off is the right was to do it, there are no exceptions to that. I think you have a crew trying to skimp so that they can make extra money by skipping a step.

    Josh Jaros (The Woodlands, TX)
     
  6. Jan 16, 2009 #6

    markp7575

    markp7575

    markp7575

    New Member

    Joined:
    Jan 16, 2009
    Messages:
    3
    Likes Received:
    0
    Thank you for the advice...............
     
  7. Jan 17, 2009 #7

    triple D

    triple D

    triple D

    Well-Known Member

    Joined:
    Jan 30, 2008
    Messages:
    296
    Likes Received:
    1
    Its been my experience that when something dont smell right, you call the highest ranking, or ask to speak with the owner. Then tell them good friends of yours have said no roof gets a "tear off" without all paper and nails coming off, before new paper goes down. Then ask for it to be done, or you want a written warrinty on their workmanship. Good luck....
     
  8. Jan 20, 2009 #8

    esma

    esma

    esma

    Member

    Joined:
    Jan 18, 2009
    Messages:
    6
    Likes Received:
    0
    My brother has a small house 1100 square feet. The roof needs to be changed. It leaks often and living room ceiling is sagging.
    A roofer has told "that the whole thing" should come out and it will cost $5,500.00.
    Can you guide us what does the "whole thing" means, what should we look for in the roofer, warranty? and is the price right?
     
  9. Jan 20, 2009 #9

    inspectorD

    inspectorD

    inspectorD

    Housebroken Staff Member Admin Moderator

    Joined:
    Dec 17, 2005
    Messages:
    4,503
    Likes Received:
    267
    ;)Well it depends on the style of roof you are putting back in. Usually it is an asphalt or fiberglass matt shingle you will install. Just like the ones that came off.
    1. Remove all old roofing and tar paper.
    2. Check all boards or plywood for damage and nail down loose boards. Any replaced boards will usually cost extra because that is more work which was not visible until the shingles where removed.
    3. Install new metal drip edge at the bottom of the roof, this is the stuff that lets water run into the gutter. Install Ice and water membrane at the bottom 3 feet of roof and in valleys (where 2 roofs meet).This is basically a sticky rubber membrane to keep ice dams and water from coming into the attic space. And last, install a metal rake edge at the side edges or ends of the roof to hold down the tar paper.
    4. install any boots over pipes which protrude out of the roof for plumbing or vents out the roof.
    5. Install the new shingles, which you picked.
    6. Install any metal flashings for chimneys or skylights.
    7. Install any ridge vent and soffit vents to complete the system if it needs it.
    These are the things usually included.
    If you post a pic of the roof and what the roofer comes up with we can look at it further.
    Good luck.
     
  10. Jan 20, 2009 #10

    esma

    esma

    esma

    Member

    Joined:
    Jan 18, 2009
    Messages:
    6
    Likes Received:
    0
    thanks a lot u have been very helpful. I am out of town I will be back in a week and I will post the picture of the roof.
     

Share This Page