MoreCowbell
Well-Known Member
- Joined
- May 29, 2011
- Messages
- 59
- Reaction score
- 4
I am ready to start placing my basement slab doing one small (8'x8') section at a time (thank for the idea BridgeMan) . I am trying to educate myself on the finishing process before i start mixing.
Everything i read says this:
1) Screed
2) Bull float immediately after screeding to push the aggregate down
3) Hand float after bleed water dries
4) Steel trowel to a smooth finish
I'm wondering how to adapt the bull float step to a small slab. Can I just use a wood hand float to do that?
Also, I would certainly welcome any other tips related to what I'll be doing. Thanks.
Everything i read says this:
1) Screed
2) Bull float immediately after screeding to push the aggregate down
3) Hand float after bleed water dries
4) Steel trowel to a smooth finish
I'm wondering how to adapt the bull float step to a small slab. Can I just use a wood hand float to do that?
Also, I would certainly welcome any other tips related to what I'll be doing. Thanks.