Ok, so last summer I installed 8mm laminate flooring on a cement floor. I used a vapour barrier underlay. Floor is holding up well. I left a 1/4" gap around for expansion due to temperature.
The problem is, some of the slats are shifting. The flooring stated it did NOT need to be glued. But...