Thanks to everyone for suggestions. For now, I am going with sump pump and interior drain tile and I will contact the original contractor.
This summer when it dries up, I am considering excavating about a 10 foot long trench from the foundation out, maybe a 3 feet wide, and a foot or 2 below...