The wife wants a small area done in front of the bar downstairs in tile , i am considering maybe putting concreate board down first in that area it would be like 3x8 section
Was wondering as well what mil of vapor barrier too lay down on the slab before i put foam down and do i bring the plastic a bit up the wall on studding or up too sill plate.
Okay wife wants too re do basement including ripping out carpet and old cedar tongue and grouve boards and replace it with sheet rock , for the floor we have enough laminate i got for free its 12 mil. but she wants tile in front of open bar as we want too eventually put a counter too make it...