@beachguy005 Thank you very much for the above reply. I have been discussing the cutting and replacement of the strapping with some contractors and I was given the impression by one that the entire length of strapping of 8' - 10' will need to be replaced. Placing a 2" x 4" in between the joists...
Hello and thank you for the response. The reason that the strapping is being cut is appears that the strapping located near the intersection has split causing the drywall to sag ever so slightly.
Hello the entire piece of strapping located right at the joist needs to cut. My question is will the entire strip of strapping (10'-15' in length) or just the area of where the strapping is cut will need to be replaced ? Wouldn't the rest of the strapping around the area of where the cut is...