Thanks for the quick response. Yes, the power pile has my meter on it with the mainbreaker. I will need to use schedule 40(Electrical) underground. If I use 2/0 copper, will I lose too much amperage over 300 feet? And why 4 wire? Ground, nutral, and hot, what is the fourth for?
Thanks...