I received my first quote for building a stand up tile shower, roughly 30"x60" with 8' ceilings, in my second floor condo, pictured below. I'm either out of touch with what this should cost, or this is too good to be true. As it says, it does not include plumbing or drywall work, but I figured the build and tile work would be more. Total for the pre-fab pan option and floor tile is around $2000, with the mud pan being $1000 more.
How does this sound do you? Does a mud pan offer any benefit over a pre-fab pan?