I am remodeling an upstairs bathroom. It had a shower in it that was the old style square pedestal with ceramic tiles. I am putting in a tub and surround. The floor joists are not tall enough to handle the overflow, drain and trap for the tub. the only thing I can see to fix this problem is to elevate the tub by 1 1/2". This will leave a gap on the front of the tub between the tub and the floor. The best solution I can come up with to fill the gap that won't require constant attention to keep it from water damage is to find some Corian to use as a filler strip.
Does anyone know where you can custom order Corian? I am needing a piece 3/4" X 1 1/2" X 60".
Thanks for all the ideas and help! Also, if you have a different/better solution to filling the gap, I'm all ears.
Ken
Does anyone know where you can custom order Corian? I am needing a piece 3/4" X 1 1/2" X 60".
Thanks for all the ideas and help! Also, if you have a different/better solution to filling the gap, I'm all ears.
Ken