I have to add a double 3.5"×7.25" lvl in my basem3nt with 2 new 3" adjustable columns. I have no lvl experience. What's the proper way to nails lvls tog3ther? And what's the proper way to attach them to a metal column?
That is question for the engineer, most time they just want them nailed with a spacific pattern and sometimes they want bolts and other times they don't want holes in them for bolts or anything else. Best to talk to the guy that will either pass or fail the job.
Enter your email address to join: