lookingforanswers
Member
- Joined
- Jun 4, 2016
- Messages
- 9
- Reaction score
- 3
Last edited:
I've got some shoveling to do.
The basic idea is to displace as little soil as possible while excavating the original pier working from the direction of the end of the beam.
How will I anchor the new pier to the footing - if their is one?
I'll post a new photo of what I'm dealing with after I get the pier dug out. I'm assuming this would have to be done by myself or by hiring a contractor anyway. I prefer handling the labor side of the job myself and let a pro do the installation anyway.
Thank you again for the insight.
Enter your email address to join: