swimmer_spe
Well-Known Member
- Joined
- Apr 29, 2015
- Messages
- 944
- Reaction score
- 175
I am going to begin finishing my basement. It is concrete block foundation.
I want to put down the interlocking tiles that are wood and plastic; I think they are called dry core subfloor. I then want to put 2x4s along the exterior wall so that I can insulate the room, as well as have space to put in electrical outlets.
Do I put down the subfloor first, then the walls or the walls first then the subfloor?
I want to put down the interlocking tiles that are wood and plastic; I think they are called dry core subfloor. I then want to put 2x4s along the exterior wall so that I can insulate the room, as well as have space to put in electrical outlets.
Do I put down the subfloor first, then the walls or the walls first then the subfloor?