cgarcia6445
Member
- Joined
- Apr 14, 2017
- Messages
- 14
- Reaction score
- 1
Our basement bathroom renovation is up and going.
This is it after removing the previously placed tiles walls.
The rear wall as you can see has hoise wrap just over the foundation wall. What used to be there were make shift 1x4 boards masonry nailed to the foundation and cement board attached to that, seemed strange. I too or bottom plate on this wall.
The toilet is placed so that there is very little room.
I can put 2x4s in lieu of the 1x4s that they used no problem.
My main Q is should I use anything else for a barrier as this tyvec is pretty shredded.
Seal the concreate wall and 6mil under the cement board?
This was a home built in 86 in NV.
This is it after removing the previously placed tiles walls.
The rear wall as you can see has hoise wrap just over the foundation wall. What used to be there were make shift 1x4 boards masonry nailed to the foundation and cement board attached to that, seemed strange. I too or bottom plate on this wall.
The toilet is placed so that there is very little room.
I can put 2x4s in lieu of the 1x4s that they used no problem.
My main Q is should I use anything else for a barrier as this tyvec is pretty shredded.
Seal the concreate wall and 6mil under the cement board?
This was a home built in 86 in NV.