Hello Everyone, new to the forum. I want to thank everyone for your advise ahead of time.
my project is to build a brick bbq. A concrete slab already exists in my backyard which apparently used to have a shed on top.
The slab is sloped 2 degrees and from onside to the other there is about a 3 inch drop.
Do I have to level it before I lay the brick or can I level it with the base layer of mortar?
I apologize if this is a stupid question but I am new to brick laying.
Thanks again,
Fernando
my project is to build a brick bbq. A concrete slab already exists in my backyard which apparently used to have a shed on top.
The slab is sloped 2 degrees and from onside to the other there is about a 3 inch drop.
Do I have to level it before I lay the brick or can I level it with the base layer of mortar?
I apologize if this is a stupid question but I am new to brick laying.
Thanks again,
Fernando