It's an OR functionWhat I would like to do is use a Pump Start Relay to start the water feature pump when irrigation is called for.
But I'd also like to be able to override the pump start relay to run the pump manually when irrigation is not called for so I can run the water feature...
It's an OR function
so the override switch contacts need to be in parallel with the relay contacts.
I figured the switch contacts would be in parallel with the relay contacts.So you believe that I can connect two 24VAC inputs to the input side of the relay?
Please bear with me...I'm a Mechanical Engineer...
What happens if this override switch is "on" and the irrigation controller sends a "pump start" signal (also 24VAC) to the same inputs on the relay at the same time? Now there are two 24VAC signals on the input side of the pump.