after installing french drains in my finished basement, should the concrete floor go under my finished wall leaving an inch gap between my foundation wall and interior wall or should there be an inch of gravel on the inner perimeter of the interior wall? If so, how would i finish the basement flooring with tiles? How are my walls supported without cement under them?