user 45213
Member
- Joined
- Mar 4, 2017
- Messages
- 18
- Reaction score
- 0
Thanks for the suggestions. What would be the best bet for raising the 2 walls that run parallel to the joists? I was thinking about putting in 9'' tall 4x6 posts on the stem wall every 12''to support that wall or blocking underneath that wall to support it when I do the subfloor. It is more then likely going to be rotten whatever is currently their. Their may not be a sill plate their either. I think that those 2 walls will be the hardest part of the job. The interior walls I can attempt to put another joist under or just block them. I just don't know how much room I will have between the last joists that runs next to the stem wall and the space where the sill/rim joist should be.