HI,
I'm ready to start framing out the inside of my 8' concrete basement walls. Is ther any reason why I should use 2x4 instead odf 2x3? Would either be easier to work with etc??
I do not need the added strenght of the 2x4's since my walls are 8-foot concrete. Just making a space for wires and added insulation. I will be finishing with batt insulation, vapor barrier and drywall. I will be adding this to the 1.5" styrofoam already on the concrete.
Thanks!
I'm ready to start framing out the inside of my 8' concrete basement walls. Is ther any reason why I should use 2x4 instead odf 2x3? Would either be easier to work with etc??
I do not need the added strenght of the 2x4's since my walls are 8-foot concrete. Just making a space for wires and added insulation. I will be finishing with batt insulation, vapor barrier and drywall. I will be adding this to the 1.5" styrofoam already on the concrete.
Thanks!