marklevinson1
Member
- Joined
- Apr 5, 2007
- Messages
- 7
- Reaction score
- 0
Hi,
I have been remodeling my kitchen for the past year having stripped it down to the studs. I have completed the plumbing, electrical and gas and have just finished all the insulation and am now ready for the drywall. The kitchen had an 8ft ceiling.
I currently have a 1/2" of subfloor down now. I plan on adding another 5/8" of plywood to the subfloor, a layer of cement board and then tile. I figure about 2 inches higher than what I have now. I had wanted to do the drywall before the tile because of the mess, of course. I am just confused as to the height of the drywall. I just measured from my current subfloor to the ceiling joist and that just happens to measure 96" now before any drywall is on the ceiling or any flooring has been put down. I also know i need to keep the drywall off the floor by about a 1/2".
I am not sure how to go about this? Which should I do first? The drywall or the floor. If I do the drywall first, how do I ensure I cut it to the right height before the flooring goes in? It would seem that I will have to cut down all my drywall to fit the reduced height of my kitchen. Any input would be appreciated.
Thanks,
Mark
I have been remodeling my kitchen for the past year having stripped it down to the studs. I have completed the plumbing, electrical and gas and have just finished all the insulation and am now ready for the drywall. The kitchen had an 8ft ceiling.
I currently have a 1/2" of subfloor down now. I plan on adding another 5/8" of plywood to the subfloor, a layer of cement board and then tile. I figure about 2 inches higher than what I have now. I had wanted to do the drywall before the tile because of the mess, of course. I am just confused as to the height of the drywall. I just measured from my current subfloor to the ceiling joist and that just happens to measure 96" now before any drywall is on the ceiling or any flooring has been put down. I also know i need to keep the drywall off the floor by about a 1/2".
I am not sure how to go about this? Which should I do first? The drywall or the floor. If I do the drywall first, how do I ensure I cut it to the right height before the flooring goes in? It would seem that I will have to cut down all my drywall to fit the reduced height of my kitchen. Any input would be appreciated.
Thanks,
Mark