sarahwings
New Member
- Joined
- Sep 12, 2006
- Messages
- 3
- Reaction score
- 0
Hello everyone,
First post here -
I am putting in ceramic hexagon tile in our bath, refinishing the walls and ceiling and having a new sink and toilet installed, so basically everything!!
Do you suggest doing the floor or the walls first?
I just put down backerboard over the existing vinyl (i think it is asbestos, so i left it undisturbed). I have to put up new drywall to fill areas ripped out for new plumbing, repaint walls and ceiling and paint the old woodwork which is in bad shape.
What do i do first?
Thanks!
Sarah
First post here -
I am putting in ceramic hexagon tile in our bath, refinishing the walls and ceiling and having a new sink and toilet installed, so basically everything!!
Do you suggest doing the floor or the walls first?
I just put down backerboard over the existing vinyl (i think it is asbestos, so i left it undisturbed). I have to put up new drywall to fill areas ripped out for new plumbing, repaint walls and ceiling and paint the old woodwork which is in bad shape.
What do i do first?
Thanks!
Sarah