though I've probably done a lot of "house" repairs on my own over the years, one of the things I've never tackled is "roofing". I recently purchased a Kit Shed (10x10 'barn') and have finished the sheathing and am ready to start on the roofing (main).
I've six bundles (2 square) of shingles, one roll of 15# paper, A vent ridge (4 foot which is all I figure to need in a shed roof), two 10' drip edge (shiny, sharp metal, assumed galvanized , but unknown), a bunch of roofing nails and a quantity of button nails for the paper.
I am aware that the paper goes down on top of the sheathing, but where/when do I install the drip edge? Under the paper, on top of the paper, under the shingles, on top of the shingles?
I can conceptualize the paper and the shingle layout without too much difficulty, but the edging has me in a quandry
I've six bundles (2 square) of shingles, one roll of 15# paper, A vent ridge (4 foot which is all I figure to need in a shed roof), two 10' drip edge (shiny, sharp metal, assumed galvanized , but unknown), a bunch of roofing nails and a quantity of button nails for the paper.
I am aware that the paper goes down on top of the sheathing, but where/when do I install the drip edge? Under the paper, on top of the paper, under the shingles, on top of the shingles?
I can conceptualize the paper and the shingle layout without too much difficulty, but the edging has me in a quandry