honeydooo
New Member
- Joined
- Sep 14, 2013
- Messages
- 2
- Reaction score
- 0
I have sketched some plans to build a deck off my master bedroom. I would like to include a hot tub that is sunken so entering he hot tub is simply stepping down into it.
I want this deck built at the same finished level as the master bedroom. The grade of my yard in only about 4-6" below the finished floor of the master. I do have a french drain running along the area but its only another 6" deep.
I expect to put a retaining wall around the hot tub and build the deck over this dug out area.
Has anyone been involved with installing a sunken hot tub?
Thank you in advance.
I want this deck built at the same finished level as the master bedroom. The grade of my yard in only about 4-6" below the finished floor of the master. I do have a french drain running along the area but its only another 6" deep.
I expect to put a retaining wall around the hot tub and build the deck over this dug out area.
Has anyone been involved with installing a sunken hot tub?
Thank you in advance.