So, I cut out some ceiling drywall in the basement and what do I see, 12 3/8 " holes in a perfect horizontal row ~half an inch above the bottom of the joist with an avg of 1/8" of wood between the holes and only 1, 12awg wire set in each... for about 10 joists in a row before most of the wires had split off... I mean really WTF did the previous owner think he was doing. He gave me a permit & inspection that when the panel was upgraded to 150A serivce in '96 (only a 1989 house) was done he had it inspected but what type of country bumpkin would OK this... I should take a picture it's pretty funny, if you're not the owner.
So he violated what ~3 codes... SO what do I do? I found this website that confirmed what I thought it should look like http://www.familyhandyman.com/floor/how-to-drill-through-floor-joists/view-all
Should I pull all the wires out and reinforce the joist then make 4 or 5 2" holes in the center to route those and the new wires through in the center That's at least a 20 day job with lots of dry walling... and I'm not good at drywalling to make it look good.
Or just re-use the current holes , make a few bigger and stick the new circuits through or... patch it up pretend I never saw it move a foot down and drill a new 2" hole in the center for the new circuits...What's the "right" thing to do? will it matter? Should I expect the house to collapse in a vortex of death and destruction followed by the formation of an unstable singularity, fed by the photons of despair, this house has created in my soul, that I am telepathetically emitting, all centered 10 inches under the fridge ...
I also found out the 150A panel & the off peak panel are on the same lug in my power company box... that was sealed... I mean WOW can no one in ND do anything right, the owner, power company & inspector must have all been drinking buddies at the lodge or something...
30k into the perfect house that only needed new carpet and a coat of paint...
So he violated what ~3 codes... SO what do I do? I found this website that confirmed what I thought it should look like http://www.familyhandyman.com/floor/how-to-drill-through-floor-joists/view-all
Should I pull all the wires out and reinforce the joist then make 4 or 5 2" holes in the center to route those and the new wires through in the center That's at least a 20 day job with lots of dry walling... and I'm not good at drywalling to make it look good.
Or just re-use the current holes , make a few bigger and stick the new circuits through or... patch it up pretend I never saw it move a foot down and drill a new 2" hole in the center for the new circuits...What's the "right" thing to do? will it matter? Should I expect the house to collapse in a vortex of death and destruction followed by the formation of an unstable singularity, fed by the photons of despair, this house has created in my soul, that I am telepathetically emitting, all centered 10 inches under the fridge ...
I also found out the 150A panel & the off peak panel are on the same lug in my power company box... that was sealed... I mean WOW can no one in ND do anything right, the owner, power company & inspector must have all been drinking buddies at the lodge or something...
30k into the perfect house that only needed new carpet and a coat of paint...